Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 // o /~ ~ l~ /j D I v t 5 I o N o f <br />Phone: (303) 866-3567 , / I~ fJ C Nl}LyY~.~C.. ~ tom[) t Ar Lv ~I t/ /"/l/(>/ M I N ERA L S <br />FAX: (303) 832-8106 V V l~ Y~_/) _/ <br />~~xfQQ( I/ GEOLOGY <br />~CQS~7 '~©a'V~ ~~~I~v~I.. ~~~G-I `_/ RECLAMATION <br />o - MINING•SAFETY <br />Bill Owens <br />Governor <br />MEMO TO FILE Greg E. Walther <br />Executive Director <br />Ronald W. Cattany <br />Date; 1/14/03 ~ - ~' Acting Division Director <br />/,a' /J <br />Specialist: Allen Sorenson Signed: !~i/~~~ <br />Subject/Operator/Operation/File No. Pending Technical Revision, <br />American Gypsum, Eagle Gypsum Mine, Permit No. M-1984-041 j/ <br />Type of Interaction: Meeting Phone Other <br />Person(sj contacted and affiliation: Joel Jones, Kni hQ t Pieshold, 303/629-8788 <br />Summary and Resolution of Interaction: <br />Mr. Jones is preparing a final design for the access road to the new mining area approved under permit <br />amendment AM-00003. The final design will include some minor changes to what is currently approved. <br />In particular, the proposed sediment pond spillways will be routed through the dam abutments rather than <br />over the embankment crests as currently approved. I told Mr. Jones that the modifications must be <br />incorporated into the permit through the technical revision process. <br />cc: Gregg Squire, DMG (via electronic transmission) <br />Carl Mount, DMG (via electronic transmission) <br />c:AaesVvly Doeumen[s~Eagle Gypsum access road design MTF.doc <br />