Laserfiche WebLink
' R <br />n <br />~ a, <br />y <br />,, '~:: <br />OWNED AND OPERATED BV: <br />BUDGIE C. FAZZINO <br />JOSEPH R. CARPINE <br />III III III III IIII III <br />999 <br />TWIN PINES CORL CO. <br />QUALITY GRADED COAL AND OIL TREATED STOKER <br />7780 BROOKSIDE AVE. <br />CANON CITY, COLORADO 81212 <br />Mined Land Reclamation- <br />423 Ct~ntennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Mr. Tom Gillis <br />Reclamatton Specialist <br />Dear Tom, <br />phone: 275-7456 <br />or 275-5512 <br />RECEIVED <br />JUN 2 b 1991 <br />h11NED LAND RECLAMATION-COAL <br />COLO. DEPT. OF NATURAL RESOURCES <br />The reclamation schedule at the Twin Pines will be conducted <br />as following to the best that conditions will allow. <br />1. Work at present is removing all none used mining equip- <br />ment out of mine. cars, rails, etc. This is completed. <br />2. Removing all timber, rails and supplies from top of <br />tipple area. One half done. <br />3. Removed old remains of old wooden tipple on side of hill. <br />Completed. <br />4. All none used equipment and supplies to be sold after the <br />first of the year are being moved to the lower shop area. <br />Schedule of Reclamation of the Portal areas are as follows at end <br />of mining by August 14, 1981. <br />1. West portal sealed and partial reclamantion by September <br />30, 1981. Nas[e disposal area will be covered also by <br />September 30th. <br />2. Main slooe sealed by September 30th. Tipple will remehn <br />in place and outside motor charger room. <br />3. Fan will be romoved area reclaimed by September 30, 1981. <br />4, All mining equipment and supplies will be moved to the <br />shop area. <br />5. The sediment pond will remain in place until all mining <br />equipment and structures have been removed. Then it will <br />be filled in and area re-seeded. ' <br />