My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53111
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:46 PM
Creation date
11/23/2007 8:20:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
6/8/1984
Doc Name
FORMAL HEARING FINDINGS OF FACT AND DECISION
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• _6_ • <br />RIDER TO MINING PERMIT <br />Permit Date June 4, 1984 Permit No. C-044-81 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulations attached to September 2, 1983 Findings Document. <br />See Attachment A <br />Stipulations attached to April 9, 1984 Findings Document. <br />25. EMPIRE ENERGY CORPORATION SHALL PERFORM A MINIMUM OF 7W0 ADDITIONAL <br />COMPLETE CHEMICAL AND PHYSICAL ANALYSES ON ROOF, FLOOR, INTERBURDEN <br />(ROCK SPLIT) AND COAL STRATA FROM REPRESENTATIVE LOCATIONS IN THE EAGLE <br />N0. 9 MINE'S PERMIT AREA. RESULTS OF THESE ANALYSES SHALL BE SUBMITTED <br />TO THE DIVISION WITHIN 60 DAYS OF THE ISSUANCE OF THIS PERMIT. <br />26. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO INSTALL AND MONITOR <br />ONE SET OF SURVEY MONUMENTS OVER A SET OF DEVELOPMENT MAINS AT THE EAGLE <br />ND. 9 MINE. THE MONUMENT SERIES OVER THE DEVELOPMENT MAINS AND MONUMENT <br />SERIES H AND I SHALL BE INSTALLED NINETY (90) DAYS PRIOR TO MINING. THE <br />SURVEY MONUMENTS SHALL BE PLACED OVER MINE AREAS WHICH WILL BE MINED <br />WITHIN TWELVE (12) MONTHS OF THE TIME THAT MINING BEGINS. TWO MONTHLY <br />MEASUREMENTS OF THE SURVEY MONUMENT ELEVATIONS SHALL BE MADE PRIOR TO <br />UNDERMINING THE SETS OF SURVEY MONUMENTS. ONE MEASUREMENT OF THE SURVEY <br />MONUMENT ELEVATIONS SHALL BE MADE IMMEDIATELY AFTER DRIVING THE <br />DEVELOPMENT MAINS AND AFTER ROOM AND PILLAR ADVANCE. ALL SUBSEQUENT <br />MONITORING OF SURVEY MONUMENT ELEVATIONS SHALL BE MADE QUARTERLY. ALL <br />DATA FROM THIS SUBSIDENCE MONITORING SHALL BE SUBMITTED IN THE COMPANY'S <br />SEMI-ANNUAL SUBSIDENCE REPORT. <br />27. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO VISUALLY MONITOR THE <br />IRRIGATION DITCHES WITHIN THE ANGLE OF DRAW OF THE ACTIVE WORKINGS AND <br />THE LAND SURFACE OVERLYING THE EAGLE N0. 9 MINE IN THE YAMPA RIVER BIG <br />BOTTOM ALLUVIAL VALLEY FLOOR. THE COMPANY SHALL CONDUCT THIS MONITORING <br />ON A WEEKLY BASIS DURING THE PERIOD BETWEEN SNOWMELT AND THE END OF THE <br />GROWING SEASON OF EACH YEAR. MONITORING SHALL COMMENCE AS THE AREA IS <br />UNDERMINED AND THE MONITORING RECORDS SHALL BE KEPT ON FILE AT THE MINE <br />OFFICE. IF SUBSIDENCE DAMAGE IS OBSERVED, THE COMPANY SHALL IMMEDIATELY <br />NOTIFY THE DIVISION AND SHALL INSTITUTE THEIR MITIGATIVE PLAN PROPOSED <br />IN SECTION 4.6.4, PAGE IV-194a OF THE PERMIT APPLICATION. <br />28. NO EXTRACTION OF COAL SHALL OCCUR IN THE CONTESTED LANDS OF THE <br />EAGLE N0. 9 MINE UNTIL THE MINED LAND RECLAMATION BOARD MAKES A FINAL <br />DECISION CONCERNING EMPIRE ENERGY CORPORATION'S RIGHT OF ENTRY ONTO <br />CONTESTED LANDS (AS DESCRIBED BELOW). EMPIRE ENERGY CORPORATION IS <br />REQUIRED TO CONDUCT MAINTENANCE, RECLAMATION AND OTHER ANCILLARY <br />OPERATIONS AT THE EAGLE N0. 9 MINE AS DESCRIBED IN PERMIT APPLICATION <br />C-044-81. <br />
The URL can be used to link to this page
Your browser does not support the video tag.