My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53111
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:46 PM
Creation date
11/23/2007 8:20:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
6/8/1984
Doc Name
FORMAL HEARING FINDINGS OF FACT AND DECISION
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment A <br />1. IF PREVIOUSLY UNAPPROVED SURFACE DISTURBING ACTIVITIES ARE <br />NECESSARY, THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT <br />A REVISION FOR APPROVAL BY THE DIVISION INCORPORATING A <br />JUSTIFICATION AND MAPS SHOWING THE PROPOSED DISTURBANCE PRIOR TO <br />THE COMMENCEMENT OF THESE ACTIVITIES. SHOULD THE PLANNED ACTIVITY <br />BE LOCATED IN AN AREA WHICH HAS NOT BEEN PREVIOUSLY SURVEYED, AN <br />INTENSIVE CULTURAL RESOURCES INVENTORY (TOTAL GROUND SURVEY) MUST <br />BE CONDUCTED BY A QUALIFIED PROFESSIONAL ARCHAEOLOGIST AND THE <br />RESULTS SUBMITTED TO THE DIVISION FOR REVIEW AND APPROVAL. <br />2. WITHIN 30 DAYS OF PERMIT ISSUANCE THE DIVISION DIRECTS EMPIRE <br />ENERGY CORPORATION TO SUBMIT TO THE DIVISION COPIES OF COMPLETE <br />LABORATORY DATA FROM THE EAGLE N0. 5 MINE SUMP STUDY AND AN <br />ANALYSIS OF THE DATA. THE ANALYSIS OF DATA SHALL INCLUDE A <br />DESCRIPTION OF TRENDS WITH TIME IN SOLUBLE SALTS, TOXIC METALS, <br />TDS, ELECTRO-CONDUCTIVITY AND pH CONCENTRATIONS. <br />3. FOR THE EAGLE N0. 9, THE DIVISION DIRECTS MINE EMPIRE ENERGY <br />CORPORATION TO CONDUCT MINE INFLOW STUDIES FOR ALL ACTIVE OR <br />UNSEALED UNDERGROUND COAL MINE WORKINGS. ANNUAL INFLOW STUDIES <br />SHALL BE CONDUCTED FOR EACH ACTIVE OR UNSEALED MINE IN THE MONTH OF <br />JUNE, AND THE RESULTS OF EACH INFLOW STUDY SHALL BE SUBMITTED TO <br />THE DIVISION BY THE FIRST OF AUGUST OF THE SAME YEAR. THE MINE <br />INFLOW STUDIES SHALL INCLUDE: <br />A) THE MAPPING OF EACH POINT SOURCE INFLOW (I.E. FAULTS, FRACTURED <br />ROOF, FRACTURED FLOOR, EXPLORATION DRILL HOLE, ETC.) AND EACH <br />AREA-WIDE INFLOW (I.E., DRAINAGE FROM SEALS TO ABANDONED MINE <br />WORKINGS: AREAS OF WEEPING COAL FACES, ROOF, OR FLOOR, ETC.) ON <br />UP-TO-DATE MINE WORKINGS MAPS; <br />B) THE MONITORING OF ALL MAPPED INFLOWS FOR FLOW RATES, pH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE; AND <br />C) THE PRODUCTION OF TABLES OF ALL INFLOWS MAPPED WITH DATA ON <br />THEIR FLOW RATES, pH'S, ELECTRO-CONDUCTIVITIES AND TEMPERATURES; <br />AND THEIR SOURCE (I.E., FAULTS, FRACTURES, DRAINAGE FROM SEALS, <br />ETC.). <br />IF THE DISCHARGE IN THE EAGLE N0. 5 MINE EXCEEDS 20% OF THE ANNUAL <br />PROJECTED DISCHARGE THE STUDY OUTLINED ABOVE SHALL BE CONDUCTED AND <br />A REPORT SUBMITTED WITHIN 90 DAYS. <br />WITHIN 120 GAYS OF PERMIT ISSUANCE, THE DIVISION DIRECTS EMPIRE <br />ENERGY CORPORATION TO MODIFY THE PROPOSED HYDROLOGIC MONITORING <br />PROGRAM TO INCLUDE THE FOLLOWING: <br />
The URL can be used to link to this page
Your browser does not support the video tag.