Laserfiche WebLink
v <br />III IIIIIIIIIIIIIIII <br />~~~ ~ 999 STATE OF COLORADO <br />P,~ <br />Roy Romer, Governor <br />y ~. <br />'c <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />September 8, 1987 <br />Mr. Bob Sherman <br />The Rockcastle Company <br />C/0 Mr, blark Korb <br />Attorney at Law <br />P:O. Box 469 <br />Fort Collins, Colorado 80522 <br />Re: Mid-Term Review, Grassy Gap Mine, File No. C-81-039 <br />Dear Mr. Sherman: <br />Enclosed is the mid-term review for the Grassy Gap mine. The review was <br />performed in fulfillment of Rules 2.08.3, 2.06.2(8), 2.06.3(4), 2.06.5(3), <br />2.06.7(5), and 3:02.2(4). <br />The mid-term review process consisted of reviewing the permit application, <br />stipulations responses, revisions, and other supplemental information. The <br />purpose of the review was to identify portions of the permit which need to be <br />modified or updated to reflect the current status of the mine, and revisions <br />which may be necessary to assure compliance with the regulations. <br />In general, the conclusion of the review i.s that the permit is clear, concise, <br />and relatively current. However it will be necessary to incorporate some <br />stipulation responses, settlement agreements, and approved revisions, in order <br />to fully update the permit. In addition, there are two issues which remain <br />outstanding at this time; those being bonding and post-mining topography <br />(ADC). The Division's concerns with respect to these issues are included in <br />the mid-term document. Resolution of these concerns will require some field <br />measurements and observations, which cannot be performed until September or <br />October. If you wish to be present at this inspection, please call so that we <br />may arrange a mutually acceptable time. <br />The Dl vision will set a preliminary timeframe of October 30; 1987, for <br />submittal of responses to the mid-term review. This timeframe may be modified <br />if it appears that additional time is required. You may also wish to set up a <br />meeting to discuss the mid-term requirements. Please call 1f you have any <br />questions. <br />Sincerely, <br />Jeffrey H. Deckler <br />Reclamation Specialist <br />JHD/bdc <br />7853E <br />423 Centennial Building, ~ 313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 868-3567 <br />