Laserfiche WebLink
Roads <br />A. Haul Roads <br />Haul roads are discussed on pages 2.05-66 to 2.05-70, pages 2.05-72 to 2.05-72? of Vol. 1 and <br />pages 2.05-3 to 2.05-12 of Vol. VII of the permit application. <br />The Division proposes to approve the location of a portion of haulroad C in the channel <br />of Foidel Creek, which drains a watershed of at least I square mile, as depicted on Map <br />No. 24 Surface Facilities and Freshwater Systems. Haulroad C passes over Foidel Creek <br />in two places and the flow is diverted under the haulroad by the use of culverts <br />(4.03.1(2)(b)). <br />B. Access Roads <br />Access roads aze discussed on pages changes 2.05-70 to 2.05-72, and page 2.05-73 of Vol. 1, Figure <br />22 of Vol. III, and pages 2.05-12 to 2.05-13 of Vol. VII of the permit application. <br />The landowner has requested the retention of the first 6300 feet of the access road <br />depicted on Map No. 26, which currently accesses the Fish Creek Eorehole facility. <br />Retention of this road is compatible with the approved post mining land use of <br />pastureland, as it will allow the landowner access for management activities. The <br />Division has approved retention of the first 6300 feet from County Road No. 27 of this <br />access road (4.03.2(1)0). <br />2. The road to the Eastern Mining District dewatering borehole is proposed to be left as a <br />permanent road to facilitate the post-mining land-uses of pastureland and cropland. The <br />first 1600 feet of this road was upgraded to an access road. The Division has approved <br />retention of this road from County Road No. 33 to the dewatering borehole location <br />(4.03.2(1)(f)). <br />C. Light Use Roads <br />Light use roads are discussed on pages 2.05-73 to 2.05-74 of Vol. i and pages 2.05-13 to 2.05-14 of <br />Vol. VII of the permit application. <br />The light use road to the powerline substation will be retained as permanent. The light <br />use road to the borehole meter will be reclaimed following completion of the work <br />associated with this feature. One light use road exisu at the Fish Creek Tipple facility, <br />which will be reclaimed. <br />The Foidel Creek permit is in compliance with all rules pertaining to haul roads, access roads and <br />light use roads. <br />Il. Support Facilities <br />Support facility discussion begins on pages 2.05-17.2 to 2.05-65.2 of Vol. I and is also discussed <br />under section 2.0)-4 to 2.05-6 of Vol. VII. Maps 15, Vol. 1X and Maps 24 and 26 of Vol. V-A <br />depict the facilities as described. <br />C: W H B\C82056\RN03\RN03FIN D. doc <br />20 <br />