Laserfiche WebLink
MR 162 Development Mining Reorientation 02/04/1999 <br />MR 163 3rd Right Gateroad Relocation, and Right Sump In and FCB <br /> Treatment System Clarification 04/16/1999 <br />MR 164 Northeast Mains Rock Rooms 07/14/1999 <br />MR 16~ Additional Rock Rooms and Sump Driveage 08/02/1999 <br />MR 166 Surface Facilities Modification 11/04/1999 <br />TR I~ Permanent Waste Rock Pile 11/10/1993 <br />TR 16 Post-Mining Land Use Change 12/13/1993 <br />TR l7 Extend Longwall Panels [n SW 07/22/1994 <br />TR I8 Prep Plant Construction 04/03/1995 <br />TR 20 Batch Weigh Loadout 05/18/1995 <br />TR 19 Road Mitigation Plan 06/05/1995 <br />TR 21 Waste Pile Construction 06/Oi/1995 <br />TR 22 incidental Boundary Change 06/OS/199~ <br />TR 23 Incidental Boundary Change 11/09/1995 <br />TR 24 EMD Vent And State Coal 03/22/1996 <br />TR 25 Pond E Design 05/02/1996 <br />TR 27 Lieske Substation Upgrade 04/01/1997 <br />TR 26 Midterm Review Responses 06/27/1997 <br />TR 28 Mine Plan Modification Increase Production to 10,000,000 T/year - - 08/11/1997 <br />TR 29 Clarification of 6R Gate Road and Submain Location l 1/04/1997 <br />TR 30 Batch Weigh/Loadout Haulroad 11/24/1997 <br />TR 31 Add "Trudy's Comer" Storage Area from Eckman Park Permit; Add <br /> Topsoil from Energy Mine No. 3 Permit; Modify Processing Waste <br /> Pile Construction Methodology; Extend Culverts; Install Branding <br /> Corrals; Revise Maps 24 and 29 01/05/1999 <br />TR 33 Face Extension 2R & 3R, Gateroad 1 l & 12 (NMD), Incidental <br /> Boundary Change, Face Extension 08/31/1999 <br />TR 34 Officers and Directors Update 10/11/1999 <br />Upon cessation of mining activities, all surface disturbance will be reclaimed. Surface facilities will be removed. <br />The portal area, Area 2 pit and the waste disposal site will be backfilled with previously mined spoils existing <br />within areas adjoining the old Energy No. 1 pit. All surface disturbance will be regraded to approximate original <br />contour. Topsoil from existing and proposed topsoil stockpiles will be redistributed over the entire disturbed area <br />to depths 0.7 feet to 0.8 feet as depicted on Map 29 of the permit application, with the exception of those piles <br />which are dedicated to specific areas from which it was removed. Re-seeding and revegetation will occur <br />following topsoil laydown operations. Reclamation success will be determined by statistically comparing the <br />reclaimed areas to reference areas, except at the Fish Creek Tipple, which was constructed prior to implementation <br />of the current laws and regulations. <br />C:W H 8\C82066\RN03\RN03FI N D.doc <br />11 <br />