My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52897
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:37 PM
Creation date
11/23/2007 8:08:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
General Documents
Doc Date
4/11/1991
Doc Name
BID PACKAGE - NEW PRYOR PROJECT
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/02/90 <br />7. PROJECT SCHEDULE <br />The successful bidder shall, within ten (10) days after receipt of the Notice <br />of Award, and prior to issuance of a Purchase Order, furnish a plan for <br />construction of the work showing (1) the date(s) he expects to move various <br />pieces of equipment onto the work site, and (2) the dates and period(s) he <br />proposes to perform each phase of the project work. <br />8. NOTICE TO PROCEED <br />After a Purchase Order has been issued, the OWNER will issue Notice to <br />Proceed. Under no circumstances shall the CONTRACTOR begin work before a <br />Notice to Proceed is issued. <br />9. WORK PROGRESS <br />The CONTRACTOR agrees that work will be performed with due diligence in <br />accordance with good engineering and construction practices to the end that <br />the entire contract work shall be completed within the time specified in the <br />Special Conditions after receipt of the Notice to Proceed. It is expressly <br />understood and agreed, by and between the parties hereto, that the stipulated <br />performance time for completion of the work described is a reasonable time for <br />completion of the work, taking into consideration all factors, including <br />average climatic conditions prevailing in the area. <br />For good and sufficient cause, such as (a) unsuitable weather, (b) faulty <br />workmanship, (c) improper superintendence, (d) the CONTRACTOR'S failure to <br />carry out any reasonable order or to perform any provision of the purchase <br />order and collateral documents, or (e) any other circumstance unfavorable for <br />prosecution of the work, the OWNER shall have the right to suspend the <br />CONTRACTOR'S performance of the work. Notice of such suspension shall be in <br />writing. The CONTRACTOR shall resume performance of the work promptly when so <br />notified in writing. There will be added to the time estimated for the <br />project work noted in the Special Conditions the number of days, if any, that <br />the CONTRACTOR is allowed for reasons of unusual, unsuitable weather as <br />stipulated above. The CONTRACTOR shall not be entitled to any cost or <br />damages resulting from such suspension. No extension of time shall be allowed <br />for reasons as stipulated in (b), (c), and (d) above. <br />If the CONTRACTOR is responsible fora delay in progress of the work, the <br />CONTRACTOR shall, without additional cost, work overtime and utilize such <br />additional equipment and manpower as may be necessary to complete the contract <br />work by the stipulated date. Failure to comply will be grounds for <br />termination of this Agreement as stipulated below or assessment of liquidated <br />damages as stipulated under the Liquidated Damages clause of these General <br />Conditions. <br />MLRD-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.