My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52696
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:29 PM
Creation date
11/23/2007 7:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/28/1982
Doc Name
OSM Permit No. CO-0068
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Pose 3 <br />Hain South 100 fee[ fron the portal. This section will have three <br />entries driven 750 fee[ to the east boundary. At the boundary, rooms <br />will be driven north to [he lease bouadarv and south to the old works. <br />Panels Znd through 6th East will have four entries driven for 90D feet to <br />the ease boundarv. The 3rd and 5th East will drive roors 370 feet north <br />and leave a 50 foot-barrier between the previous panel. The 4th and 6th <br />':set Panels will mine rooms 455 feet north up to 50 feet of the previous <br />panel. The 2nd Eaet will drive roves north up to SO feet of the old <br />wrka. Pirst and 2nd best will drive five entries 1,100 feet to the <br />~.estern boundary. Rooms will be driven 420 feet north and south up to <br />50 feet of the boundary or the next panel. In the 3rd Hest, four entries <br />will be mined for 1,100 feet. Then rooz,a will be driven 286 feet son[h <br />and 800 fee[ north up to 50 feet of the northern boundary and the old <br />works. The 4th He et will have five entries driven 800 feet. <br />In all of the panels, the pillars develooed by the roor:a will be slabbed <br />' 15 feet on tw aides. The aides that are slabbed are the Bane as the <br />~, direction the panels and rooms were driven. Pillars in the panel and the <br />first pillar blocked out by rooninE will not be Blabbed. A 150-foot <br />~ barrier pillar will be left between the penel and the Y.ain South. But <br />%'~ these pillars will be recovered when retreating out of the nine. <br />,~' I ~ Bear Coal Company eetinates there is 1,?6$,000 tone of recoverable C-seat <br />coal on the lease. They will have a 3RZ recovery on development and 25~ <br />recovery on slabbing for a 63S total coal recovery. Bear pleas [o mine <br />115,000 Cana in the firer year, 275,000 tone a year for 6 years, and <br />200,000 tone in the Last year. Diligent development i^ not a problem. <br />After all [he C-scan coal is mined, a rock elope will be developed to the <br />B-seam at about 2,100 feet from [he portal. A detailed mine plan hoe not <br />beev submitted. Rear Coal Company will aL~bmit tine plane for Lhe S, E, <br />and F-seams with the future 5 gear permits. According to A.T. Hassey <br />Cosl Company's CN,D No. 1 Report, the Lease hsa the following Recoverable <br />Resource Rase: <br />Sean Tans <br />F 1,243,7R° <br />E 1,6Z7,R99 <br />R 2,586,870 <br />5,45fl,557 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.