My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-08_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2005-04-08_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 4:04:33 PM
Creation date
11/23/2007 7:57:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
4/8/2005
Doc Name
Proposed Decision & Findings of Compliance for PR11
From
West Flatiron Lease
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 9 <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE 2.04.7(1)(6), A MAP <br />SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE AREA OF THE <br />LOWER PERMANENT UNDERGROUND DEVELOPMENT WASTE PILE, IF ONE DEVELOPS. <br />STATUS: COMPLIED WITH 5/13/1988. <br />Stipulation No. 10 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY TO COMPLETE A THOROUGH <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF THE <br />PROPOSED ROAD ALIGNMENT. FURTHER THE DIVISION DIRECTS MCC, UTILIZING THE <br />RESULTS OF THE MAPPING, AND EARLIER ADJOINING SURFACE FACILITY ROAD DESIGN <br />STUDIES, IF APPROPRIATE, TO COMPLETE A PRELIMINARY ACCESS ROAD CUT-SLOPE <br />STABILIZATION AND DRAINAGE DESIGN. THE MAPPING AND PRELIMINARY DESIGN SHALL BE <br />APPROVED BY THE DIVISION, IN WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD <br />CORRIDOR. <br />STATUS: TERMINATED 5/28/92. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS MCC TO CONSTRUCT THE UPPER WASTE PILE ACCESS ROAD AS AN <br />INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. UPON EXPOSURE OF THE <br />EXCAVATED CUT-SLOPES OF THAT PIONEER ROADWAY THE OPERATOR SHALL COMPLETE A <br />FINAL GEOTECHNICAL INVESTIGATION OF THE ACCESS ROAD CORRIDOR. THIS <br />GEOTECHNICAL INVESTIGATION SHALL BE COMPLETED BY APPROPRIATELY QUALIFIED <br />PROFESSIONAL GEOLOGICAL OR ENGINEERING PERSONNEL. THE PURPOSE OF THIS FINAL <br />INVESTIGATION SHALL BE TO VERIFY, OR APPROPRIATELY AMEND, THE FINDINGS OF THE <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, MCC, UTILIZING THE FINDINGS OF THE FINAL GEOTECHNICAL INVESTIGATION, <br />SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE AND DRAINAGE DESIGN FOR THE UPPER <br />WASTE PILE ACCESS ROAD. THIS FINAL DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, AND THE CONSTRUCTION COMPLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR <br />TO THE TRANSPORTATION OF ANY WASTE MATERIAL ALONG THE ACCESS ROAD. <br />STATUS: TERMINATED 5/28/1992. <br />Stipulation No. 12 <br />THE DIVISION DIRECTS MCC TO COMPLETE THE INSTALLATION OF THE SUBSIDENCE <br />MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF COAL WITHIN THE <br />PANEL DESIGNATED IN APPENDIX A TO THE NOVEMBER 19$4 PERMIT REVISION <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.