Laserfiche WebLink
Stipulation No. 28 <br />MCC OR ANY SUCCEEDING OPERATOR OF THE WEST ELK MINE MUST CONTINUE TO SUBMIT <br />TO THE DIVISION AN ANNUAL HYDROLOGIC REPORT. THIS REPORT SHALL INCLUDE AN <br />ANALYSIS OF ALL HYDROLOGIC DATA GATHERED DURING THE YEAR, AN ASSESSMENT OF <br />THE IMPACTS OF MINING DURING THE YEAR, AND AN ESTIMATE OF THE PROJECT IMPACTS OF <br />MINING IN THE FOLLOWING YEARS. THIS REPORT SHALL ASSESS THE IMPACTS OF MINING ON <br />THE QUALITY AND QUANTITY OF WATER IN THE SURFACE STREAMS, SPRINGS, <br />GROUNDWATER AQUIFERS, MINE INFLOW AND MINE DISCHARGE. <br />STATUS: TERMINATED $/28/1992. <br />Stinulation No. 29 <br />WITHIN NINETY DAYS (9O) OF APPROVAL OF THE LOWER WASTE PILE PERMIT REVISION, <br />MCC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES MONITORING OF <br />THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF THE SEDIMENT POND AND <br />UNDERDRAIN DISCHARGE TWICE PER YEAR DURING THE SECOND AND THIRD QUARTER OF <br />THE YEAR. THE PARAMETERS SHALL BE THE FULL LIST OF CHEMICAL CONSTITUENTS, AT <br />LEAST FOR THE FIRST YEAR. MCC MAY REQUEST AN ADJUSTMENT OF THE MONITORING <br />REQUIREMENTS AFTER THE FIRST YEAR, DEPENDING ON THE RESULTS OF THE MONITORING. <br />STATUS: COMPLIED WITH 5/19/1986. <br />Stipulation No. 30 <br />MCC MUST SUBMIT ADDITIONAL BOND IN THE AMOUNTS DESCRIBED IN THE LOWER WASTE <br />PILE PERMIT REVISION APPLICATION, AT LEAST THIRTY (3O) DAYS PRIOR TO THE <br />COMMENCEMENT OF THE CONSTRUCTION OF PHASES III, IV, AND V OF THE LOWER WASTE <br />PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE DIVISION <br />PRIOR TO THE CONSTRUCTION OF THESE PHASES. <br />STATUS: TERMINATED 5/28/1992. <br />Stipulation No. 31 <br />MCC SHALL FORWARD FIVE (S) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAY'S <br />WRITTEN APPROVAL FOR ACTIVITIES WITHIN 100 FEET OF THE OUTSIDE RIGHT-OF-WAY OF <br />THE COLORADO HIGHWAY 133 WITHIN THIRTY (30) DAYS OF THE APPROVAL OF THE PERMIT <br />RE V ISION APPLICATION. <br />STATUS: COMPLIED WITH 5/19/1986. <br />Stinulation No. 32 <br />THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE FIRST <br />PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE APPLICANT SHALL <br />11 <br />