Laserfiche WebLink
<br />Stipulation Status (and date of <br />no. any change in status) <br />Description <br />ST-l active Where mining operations find <br />previously unidentified cultural <br />resources, suspend operations and <br />notify CDMG. <br />ST-2 active Do not disturb land within 100 feet <br />of the two known gravesites. <br />ST-3 active Foidel Canyon School (historical <br />buildings): Maintain fence, do not <br />disturb land within fence, and <br />protect two structures from <br />vandalism. <br />ST-15 active Do not dischazge Pond A waters for <br />irrigation use until operator <br />demonstrates that irrigation will not <br />cause material damage. <br />ST-l9 active 100 ft. buffer zone of lease C- <br />26914: conduct operations in <br />accordance with recommendations <br />of USF&W and BLM. <br />ST-24 active Evidence of right-to-enter shall be <br />' submitted before conducting <br />additional reclamation activities in <br />E/2 of W/2 of Sec. 25-SN-87W <br />ST-27 active AVS ownership & control <br />information shall be reviewed upon <br />resolution of OSM appeal of AVS <br />case <br />ST-28 inactive, complied Update topsoil stockpile locations <br />with 5/l2/97 and volumes on a map <br />Bond <br />The permittee has successfully applied for bond release 5 out of 8 times. CDMG denied <br />the following three requests for Phase Q/III release: SL-Ol, SI-02, and 51-04. They were <br />denied due to statistically inadequate revegetation data and deficient sedimentology <br />Mine No. 1 and Eckman Park Mine Page 5 September 27, 1999 <br />Midterm Review <br />