Laserfiche WebLink
3) COMMITMENT TO FILTER ALL GROUND WATER SAMPLES DESTINED FOR FULL OR <br />PARTIAL CHEMICAL ANALYSIS THAT MAY OTHERWISE SHOW SIGNIFICANT - <br />DIFFERENCES BETWEEN THE DISSOLVED AND T07AL VALUES OF THE CHEMICAL <br />CONSTITUENTS OF THE WATER AS A RESULT OF THE PRESENCE OF SUSPENDED <br />MATERIAL. SUCH SAMPLES WILL BE FILTERED THRU A 0.45 MICRON MEMBRANE <br />FILTER PRIOR TO PRESERVATION OF THE SAMPLE, AND ONLY THE FILTRATE <br />WILL BE CHEMICALLY ANALYZED. GROUND WATER SAMPLES INTENDED TO BE <br />ANALYZED FOR BIOCHEMICAL OXYGEN DEMAND OR F R BA R A <br />THE PLAN WILL BE PROVIDED IN SUCH FORM THAT IT CAN BE INCORPORATED INTO THE <br />PERMIT APPLICATION AS AN EXHIBIT. APPROPRIATE REVISIONS IDI RELATED TEXT, <br />TABLES, FIGURES, AND MAPS OF THE PERMIT APPLICATION WILL BE MADE, DATED COPIES <br />OF THIS REVISED MATERIAL WILL ALSO BE PROVIDED FOR INSERTION INTO THE COPIES <br />Of THE PERMIT APPLICATION ON FILE WITH THE DIVISION. <br />STIPULATION N0. 2 <br />~~- Y <br />THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION, WITHIN 90 DAYS OF PERMIT <br />ISSUANCE, TO SUBMIT TO THE DIVISION THE RESULTS OF THE SAMPLING PROGRAM FOR <br />ALL OVERBURDEN PROPOSED TO BE USED FOR PLANT GROWTH MEDIA. <br />BASED UPON THE RESULTS OF THESE STUDIES, AND THE UTILIZATION OF ANY PROPOSED <br />SOIL AMENDMENTS, THE APPLICANT SHALL DEMONSTRATE TO THE DIVISION'S <br />SATISFACTION THAT THE PROPOSED OVERBURDEN IS AN ACCEPTABLE PLANT GROWTH MEDIA. <br />STIPULATION N0. 3 <br />THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PLACE FOUR FEET OF <br />NON-TOXIC, NON-ACIDIC AND NON-ALKALINE MATERIAL ON THE COAL PROCESSING WASTE <br />PILE UNTIL SUCH TIME AS EMPIRE ENERGY CORPORATION SATISFACTORILY DEMONSTRATES <br />~~ TO THE DIVISION THAT THE REVEGETATION REQUIREMENTS OF RULE 4.15 CAN BE <br />ACHIEVED USING LESS THAN FOUR FEET OF NON-TOXIC COVER. IN ADDITION EMPIRE <br />ENERGY CORPORATION MUST DEMONSTRATE THAT THERE IS SUFFICIENT MATERIAL <br />AVAILABLE TO PROVIDE THIS FOUR FEET OF COVER. <br />STIPULATION N0. 4 <br />TO ENSURE PROTECTION OF GOLDEN EAGLE NESTS, NO SURFACE DISTURBANCE WILL <br />OCCUR FROM JANUARY 15 TO JULY 15 IN THE FOLLOWING AREAS: <br />~`'~ TSN, R91W NW1/4 OF SECTION 8 <br />T6N, R92W SW1/4 OF SECTION 36 WITHIN THE PERMIT <br />AREA <br />NE1/4 OF SECTION 36 <br />S1/2 NW7/4 OF SECTION 36 <br />SE1/4 OF SECTION 35 WITHIN THE PERMIT AREA <br />SE1/4 OF SECTION 25 <br />STIPULATION N0. 5 ~~_q <br />WITHIN 90 DAYS OF PERMIT ISSUANCE THE OPERATOR WILL SUBMIT AN UPDATED VERSION <br />DF MAP 26 AND EXHIBIT 18 SHOWING THE EXISTING DRAINAGE AND SEDIMENT CONTROL <br />-3- <br />