Laserfiche WebLink
<br />f. 30 Minutes of Air Time-$42.00 <br />ff. In reference to our letter of August 26, <br />1994, Item F-1. The Divisions determination <br />remains unchanged for this item and will not <br />pay for this item. <br />q. Concrete Structure-$36.00 <br />gg. in reference to our letter of August 26, <br />1994, Item G-1. We have received your bill <br />for $36.00 and will pay it. <br />h. Pending issues regarding a destroyed tree, <br />lost topsoil. <br />hh. In reference to our letter of August 26, <br />1994. Item H-1, a replacement Ponderosa Pine <br />having an estimated cost of $200.00 needs to <br />be replaced or otherwise paid for. <br />Regarding Item H-2, the 2.5 acres reclaimed <br />land that was not stripped of topsoil prior to <br />placement of Chen's Hill spoil. You brought <br />to our attention that the Amendment Number 1, <br />Item 2, paragraph 2 only referred to stripping <br />topsoil from previously reclaimed lands on the <br />East Side of Chen's Hill. The 2.5 acres of <br />land in dispute is located on the north side <br />of Chen's Hill. The Division will drop its <br />claim for compensation for lost topsoil at <br />this location. <br />Regarding Item H-3, loss of 2,419 cubic yards <br />of growth medium from the southeast corner of <br />the east pit. The Divisions determination <br />remains unchanged for this item. No <br />additional comparable material is available <br />from the project site. A local source for <br />this material will be identified and a cost <br />will be obtained for hauling to the project <br />and spreading on areas yet to be topsoiled. <br />I. In reference to our letter of August 26, <br />1994, I-1. The Division determination that <br />Liquidated Damages are due from the Contractor <br />in the amount of $2100 remain unchanged. The <br />Division will retain this amount upon final <br />settlement. <br />Mr. John Nelson inspected the punch list items on <br />September 28, 1994 and found <br />