My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52519
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:22 PM
Creation date
11/23/2007 7:48:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
1/2/1981
Doc Name
SPILLWAY RIPRAP IN SEDIMENTATION PONDS C D & G
From
ENERGY FUELS CORP
To
MLR
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />energy fuels corporation <br />box g .steamboat springs, Colorado 80477 • (303) 8733800 <br />January 2, 1981 <br />Ms. Sandra Emrich <br />Reclamation Specialist <br />Colorado Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />N <br />iii iiiiiiiiiiiiiiii ~~ <br />J <br />MINED LAND R <br />cao. DEVl, or <br />RE: Spillway Riprap in Sedimentation Ponds C, D and G <br />Dear Sandy: <br />A requirement of a CNLRD October 31, 1980, inspection of Energy <br />- :•lines No. 1 and 2 was that the emergency spillways for sedimen- <br />tation ponds C, D and G be completed by January 1, 1981. The <br />purpose of this letter is to update you on the status of this <br />project. <br />Both sedimentation ponds D and G have the emergency spillways <br />cut and the riprap material in place. This marks the comple- <br />tion of the construction of these ponds. <br />As you know, sedimentation pond C has been substantially com- <br />pleted; however, this pond still requires a very small amount <br />of riprap to be placed in the emergency spillway. This job <br />will only take approximately four hours, but due to difficult <br />access we have chosen to wait until a small front-end loader <br />can be utilized so as to minimize any additional disturbance <br />to the pond area. This riprap will be in place by January 9, <br />1981, completing the construction of pond C. <br />Please contact me if you require any additional information. <br />Sincerely yours, <br />J ~ <br />James M. riffin <br />Senior Engineer <br />Mine Planning <br />JMG/lcy <br />r~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.