Laserfiche WebLink
1. THE CHARACTERISTICS OF THE ALLUVIAL VALLEY FLOORS WHICH ARE <br />ESSENTIAL HYDROLOGIC FUNCTIONS (FLOOD AND/OR SUBIRRIGATION); <br />2. WHETHER MINING OPERATIONS WILL INTERRUPT, DISCONTINUE, OR <br />PRECLUDE FARMING OPERATIONS ON THE ALLUVIAL VALLEY FLOORS; <br />3. WHETHER MINING OPERATIONS WILL RESULT IN MATERIAL DAMAGE TO THE <br />QUALITY OF SURFACE WATER SUPPLYING THE ALLUVIAL VALLEY FLOORS, AND <br />4. A MONITORING SYSTEM TO VERIFY THESE PROJECTIONS. <br />STATUS: Complied with 10/15/99. Stipulation 9 has been satisfied by approval of PR-Ol. <br />STIPULATION NO. 10 <br />NO SURFACE COAL MINING OPERATIONS SHALL BE CONDUCTED ON FEDERAL <br />LEASE C-0114093 UNTIL THE SECRETARY OF THE INTERIOR HAS APPROVED THE <br />MINING PLAN. THE DIVISION RESERVES THE RIGHT TO MODIFY THE PERMIT, <br />WHEN APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE PERMIT <br />REQUIItEMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND <br />REGULATIONS ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br />STATUS: Complied with. Stipulation No. 10 has been satisfied by the approval of the <br />federal mining plan on 09/06/95. <br />STIPULATION NO. 11 <br />PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD ROAD PERMANENT <br />DRAINAGE, SENECA COAL COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND <br />BELOW THE RECONSTRUCTED DRAINAGE TO THE MINIMUM SPECIFICATIONS OF <br />3' DEEP AND 5' ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO PLACE A <br />GRANULAR FILTER LAYER OR GEOTEXTILE FILTER FABRIC IN THE ENTIRE <br />RECONSTRUCTED DRAINAGE CHANNEL PRIOR TO PLACEMENT OF THE ROCK <br />RIPRAP. <br />STATUS: Complied with. Stipulation No. 11 was satisfied by construction of the required <br />- - - - - -drainage amendments~d approved-on inspection-orrflH05197- - - - <br />STIPULATION NO. 12 <br />SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM <br />OF A REVISION FOR THE TOPSOIL PILES LOCATED AT THE YOAST MINE <br />ENTRANCE HAUL ROAD BY OCTOBER 15, 1996. <br />STATUS: Complied with 05/30/97. This stipulation was satisfied by the use of the topsoil <br />and elimination of the pile in Februazy 1997, and by approval of TR-O5. <br />