Laserfiche WebLink
u <br /> 2 .05. 6(1 ) <br /> 1 . A copy of the recently issued initial air emission permit for <br /> the North Portal coal handling facility needs to be submitted for <br /> inclusion in the permit. In addition, the air emission permits <br /> covering the rail loadout and the CRDA No. l , No. 2, and No. 3 <br /> facilities are missing from our copies of the permit application <br /> document, and we would request that copies of these permits be <br /> provided. <br /> 2.05.6( 3 ) <br /> 1 . On July 10, 1995, we received a copy of a letter from the Water <br /> Quality Control Division advising Powderhorn of the requirement to <br /> submit a stormwater discharge permit application and stormwater <br /> management plan to WQCD by August 14 , 1995. Please provide a copy <br /> of these completed documents to the Division. <br /> 2 .05.6(6) <br /> 1 . It appears that the subsidence section of the permit <br /> application has not been substantially modified since 1982. Have <br /> any additional structures not included in the original inventory <br /> and identified in the permit application package been constructed <br /> within the permit or adjacent area since that time? <br /> 2 . We recently received copies of mining schedule notifications <br /> mailed to the BLM and Powderhorn Properties as required by Rule <br /> 4 . 20. 2. Copies of update letters to owners and residents of areas <br /> previously undermined and adjacent areas have not yet been provided <br /> to the Division. Such documentation should be included in the mid- <br /> term response. <br /> IV. Bonding <br /> The reclamation cost estimate has been reviewed and revised to <br /> reflect 1995 equipment costs and miscellaneous revisions. The <br /> total cost estimate ( including CRDA #3 ) is $3 , 760,022 . Submittal <br /> of bond coverage for CRDA #3 is required by Stipulation No. 7 , <br /> prior to initiation of construction. As a result of the revised <br /> cost estimate, the bond amount required for CRDA No. 3 has been <br /> increased to $800 ,871 . A revised Stipulation No. 7 is enclosed. <br /> The revised reclamation liability (not including CRDA # 3) is <br /> $2 ,959, 151 . The Division currently holds Seabord Surety Bond No. <br /> 259746 issued by Seabord Surety Company, for $2 ,600,000. A rider <br /> increasing the bond amount to cover the revised liability amount <br /> will need to be submitted with the mid-term response. <br />