Laserfiche WebLink
,. <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Dale : 01-May-2001 Permil or job no.: C-81-041 Site :Roadside Portals <br />User : JRS Abbreviation : none State :Colorado <br />Filename: C041-000 County:Mesa <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Permit or job action :Technical Revision 35 Tasks Included in Roadside Portals Current Ciabi. <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />093 -Construct Sediment Pond 13 dozer 4 5.71 $3,275 <br />094 -Install Dewatering Pipe into Pond 13 Embankment excavate 1 4.0 $953 <br />095 -Install Riprap at Ou[lall Channel of Pond 13 excavate 1 21.9 $5,508 <br />096 -Install Riprap at Inlet of Pond 13 excavate 1 2.4 $616 <br />097 -Push Riprap from Inlet and Outlall Into Pond 13 dozer 4 0.1 $81 <br />098 -Regrade Pond 13 dozer 4 3.3 $1,913 <br />100 -Excavate Portal Area for French Drains excavate 1 1.6 $118 <br />101 -Install French Drains at South Portal Area mist-eqp 1 40.0 $5,930 <br />102 -Excavate Portal Area for New Drainage Channels excavate 1 58.6 $4,105 <br />103 -Install Riprap in New Drainage Channels excavate 1 172.9 $43,416 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS' 310.8 $65,915 <br />inclutles inflation laclor atliusiment of : NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />assume net hours = 50% of lack hours <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracWid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />confingencres accoun(ed for of task level <br />TOTAL DIRECT COST' $65,91$ <br />1.55 % of direct total = $1,022 <br />1.05 % of direct total = $692 <br />155.40 hrs'...$/hc $33.50 total = $5,206 <br />10.00 % of direct total = $6,592 <br /> TOTALO&P= $13,511 <br /> CONTRACT AMOUNT (tlirect+ O 8 P) _ $79,426 <br />4.25 % o/Intr. NA total = 53,376 <br />5.75 °6 0/ cntr. NA total = $4.567 <br />NA' NA total = NA <br />TOTAL INDIRECT COST= $$1,4$4 <br />TOTAL BOND AMOUNT (direct + indirect) _ $87,369 <br />