Laserfiche WebLink
List of Stipulations Resulting from this Permit Revision Approval: <br />Stipulation No. O6: <br />WITHIN 60 DAYS OF APPROVAL OF PERMIT REVISION (PR) N0. 2, NATIONAL KING <br />COAL WILL SUBMIT THREE (3) SEPARATE CHEMICAL ANALYSES THAT CONFORM WITH <br />THE MLRD 1982 GUIDELINES FOR THE COLLECTION OF BASELINE QUALITY AND <br />OVERBURDEN GEOCHEMISTRY DATA AND ARE REPRESENTATIVE OF THE COAL TO BE <br />MINED IN PR N0. 2 AND OF THE ASSOCIATED ROOF AND FLOOR MATERIALS. THE <br />APPROXIMATE GEOGRAPHIC LOCATIONS OF THESE SAMPLES WILL BE INDICATED AND <br />IDENTIFIED ON REVISED COPIES OF MAP C-10 FOR INCLUSION IN THE PERMIT <br />PACKAGE. <br />Stipulation No. 07: <br />WITHIN 90 DAYS OF APPROVAL OF PERMIT REVISION (PR) N0. 2, NATIONAL KING <br />COAL WILL SUBMIT A PLAN IN THE FORM OF A TECHNICAL REVISION TO THE PERMIT <br />BOTH ACCEPTABLE TO THE DIVISION AND THAT PROVIDES FOR THE PERMANENT <br />DISPOSAL OF THE COAL MINE WASTE GENERATED BY THE MINE. THE PLAN SHALL <br />INCLUDE AN ESTIMATE OF THE AMOUNT OF COAL MINE WASTE TO BE PRODUCED AND <br />SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 2.05.3(8), 2.05.3(9), <br />2.05.3(10), 4.10 AND 4.11. <br />8491G <br />