My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52134
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:07 PM
Creation date
11/23/2007 7:29:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
6/24/1999
Doc Name
Settlement Agreement
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anticipated Foalotnrt:on Taeke t]n PrrvOM PrePeRy, Coo/ Baarrt Mrnn <br />WORK TASKS <br />The projected work tasks inGude the following (Note that tasks are described for private property onty_ <br />Property Unes were derived from a map provided to the Division by tJC+d-Continent Resources in 1998): <br />7asx 7: Demolition <br />Task 2 Road Grading <br />Task 3; Low Water Crossing <br />Task 4: Surface Channels <br />Task 5: Earth Work <br />Task ti: Topsou Application and Surface Roughening <br />Task 7: Revegetatlon ' <br />Task tl: Post Cort5lntUion Sedimerd Control <br />TASK DESCRIPTKMI <br />TASK 1 DEi41OLIT1ON <br />The goal of this Task is to axornplish aemortion and disposal of a wncrete drainage ditch and an <br />adjacerK retaining wall, disposal of stee{ debris, trash, tires and other miscatianeous materials. <br />A sma11 amount of sleet debris, Gres, and other materials are totaled nearthe main entry gate. A small <br />amount of steel debris, other meteri&Is arxt trash may be encountered near the Rock Tunnel vidnity. <br />These metedals, as welt as arty other trash or debris, will be CdleCted and removed from the she. <br />Adjacent to Coal Creek is a concrete lined ddch and retaining wall. The ditch end wall extend east from <br />t11@ Yidnlly of a targ@ steel buikting to the tMrli Creek Diversion. Thens are three short concrete lateral <br />ditches that feed trio the main concrete ddch. These slnraraes -nll De completely removed and placed <br />with any other concrete rubble in the designated disposal area. <br />Th6 demolished concrete, htduding caber, wilt be transported to a disposal area located on top of the <br />Coal Refuse Disposal Area, approximately one hustdreA and fifty feet south of the concrete ditch. A hde <br />vall be excavated in the refuse, and the demolished concrete ruble wU16e placed in the hde. Upon <br />comptelion, the excavated refuse m71 be placed aver the concrete. The surface of the draposal area will <br />be reshaped to blend the disposal area with the adjoining refuse and hill slope <br />TASK2 ROAD GRADING <br />t3etf Line Transfer Raad <br />The approximately 450 feet long Bah Line Transfer Road (located ort the north sloe of Coal creek) wia be <br />badd'dted and graded so that the original contour of the mad Segmerri 15 approxfmated_ CNeterisl wdl be <br />excavated from the outslope of the road and piawd auto the roadway m orderto blend the hill slopes <br />above and below the road segment The fill will extend to near the crest of the existing road cut The <br />slope Of the fill vnll not be steeper than that of the slopes immediately above and below the fJi area. The <br />fill end excavation areas will be topsaled. roughened and revegetated, <br />Exhibit B to Settlement Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.