<br />Reporting Period October 28, 1997 -November 3, 1997 <br />Dewatering Borehole Road: Final grading and initial base course placement for the revised access <br />road alignment is complete. Minor water seepage continues on the east side cut slope as reported <br />previously. Survey monuments installed above the cut slope and french drain show a very minor <br />northward creep. Monitoring will continue. <br />Substation Slope: Visual observations and survey data for the slope above the substation indicate <br />movement is continuing at a slow and gradual pace, with incremental movements decreasing over time. <br />No advancement of the head scarp further upslope and into the Landing #2 Road was observed. The <br />completed mid-slope french drain appears to be functioning effectively. Three inclinometers have been <br />installed in the vicinity if the substation within the last week. The midslope inclinometer/piezometer set <br />described last week was drilled to a (bedrock) depth of 50 feet. A second inclinometer, installed on the <br />Landing #2 Road above the slide area, only reached 19 feet depth before encountering bedrock. A third <br />inclinometer, installed to the east of the substation near the last transmission line angle point, only <br />reached 24 feet depth before encountering bedrock. Initial monitoring of all of these inclinometers will <br />occur this week. <br />Shaft Site # 1 and #2: The compacted soil buttress installed to stabilize the shallow slope failure on <br />the steep cut slope south of Shaft # I was observed on November 3. The buttress appears solid and no <br />new movement was visually detected. Slopes to the east side of the buttress area, and the surficial slide <br />area reported on last week also appeaz stable. All slopes were hydroseeded during the week. Visual <br />monitoring and collection of surface survey data will continue. <br />if you have any questions or concerns, please feel free to contact me at (970) 929-2207. <br />Sincerely, <br />~, <br />Eric W. Mende, P.E. <br />E-Seam Project Civil Engineer <br />EWM/mer <br />Attachment <br />xc: Christine Johnston -MCC w/o Attachment <br />Phil Schmidt -MCC w/o Attachment <br />Steve Westbay -Gunnison County w/o Attachment <br />File w/Attachment <br />