My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-20_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2001-08-20_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2021 2:59:54 PM
Creation date
11/23/2007 7:24:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
8/20/2001
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Term Review <br /> New Elk Mine - Permit No. C-81 -012 <br /> This document presents the results of the Division of Minerals and Geology (Division) <br /> Mid-term review of the New Elk Mine operated by Picketwire Processing, Inc. This review <br /> was conducted to fulfill the requirements of Rules 2.08.3, 2.06.2, 2.06.3. 2.06.5, 2.06.7, and <br /> 3.02.2(4). <br /> Rule 2.08.3 requires that the Division conduct a review of each permit issued, prior to its <br /> Mid-term (2-1/2 years). Based on this review, for good cause shown, the Division may <br /> require reasonable revisions or modifications of the permit provisions to ensure compliance <br /> with the Act and Regulations. <br /> Rules 2.06.2, 2.06.3, 2.06.5, and 2.06.7 require that experimental practices, mountain top <br /> removal variances, variances from approximate original contour (AOC), and variances from <br /> contemporaneous reclamation, respectively, be reviewed by the Division where applicable <br /> during the Mid-term review. <br /> Rule 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br /> acceptance of the bond every 2-1/2 years. <br /> The Mid-term Review of the New Elk mine consisted of a review of the findings document, <br /> the permit application and subsequent revisions, stipulations, enforcement actions, cost <br /> estimate and other assorted permit files and information. <br /> • Section I contains a brief history of the mine. <br /> • Section II contains a summary of permit actions. <br /> • Section III is a review of the stipulations attached to the permit. <br /> • Section IV is a review of the enforcement actions issued since March 1999. <br /> • Section V is a summary of the review of the permit application. <br /> • Section VI is a review of the Bond(s) and the reclamation cost estimate. <br /> Section I - Mine History and the Environment <br /> The New Elk Mine is located approximately 24 miles west of Trinidad, Colorado. <br /> Highway 12 bisects the permit area. Previously known as the Allen Mine, it has been in <br /> -2- <br /> L_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.