Laserfiche WebLink
As was the status at the time of Permit Renewal No. 3 (RN-03), the mine remains in <br /> temporary cessation. The proposed plan for the New Elk facility is for processing and <br /> loadout operations only. Further coal production is not planned at the New Elk mine. <br /> During active mining, the workings progressed mainly to the south and east. Coal was <br /> extracted by the use of continuous miners and longwall mining methods. Only one <br /> seam, the Allen seam, was mined. <br /> Section II - Revisions to the Permit <br /> Permit Revisions since Renewal No. 3 (March 1999) <br /> Revision Number Description Date Approved <br /> none <br /> Technical Revisions since Renewal No. 3 (March 1999) <br /> Revision Number Description Date Approved <br /> TR-44 Change Reference Area Dec 1999 <br /> TR-45 Change Pond Operation Feb 2000 <br /> Minor Revisions since Renewal No. 3 (March1999) <br /> Revision Number Description Date Approved <br /> MR-81 Surface Disturbance Boundary Dec 1999 <br /> MR-82 Extend culvert C-24 August 2000 <br /> MR-83 Change ownership Feb 2001 <br /> Bond Releases since Renewal No. 3 (March 1999) <br /> Bond Release Description Date Approved Post-approval liability <br /> None <br /> -9- <br />