Laserfiche WebLink
iiiiiiiiiiiiiiiiii <br />ANNUAL BOND COMPLIANCE TRACKING <br />Mine: Nucla, Peabody Coal Co. Permit No.: C-81-008 <br />Date: Inspector: a apton <br />Bond Inspectton optc: Topsoil Stockpile Volumes Rule: <br />* Inspected Area <br />Legal Description (Accurate to 1/4 1/4 Section): S 1/2, SW 1/4, Section 25, T47N, R16W, of <br />N.M.P.M. <br />creage: <br />Narrative ocatton escrtptton: opsoil Stockpiles 8 and 13, northwest and north <br />(respectively) of Pit 1 (5W Pit) Area. <br />** a e tna ra tng omp e e <br />** Date Topsoiling Completed: <br />** Date Initial Seeding Completed: <br />** Date Final Seeding Completed: _ _ <br />Map Reference: Exhibit 21-1, Topso a ante an <br />Inspection Procedure <br />Measured distance and bearing around 'foot <br />nt' of stockpiles ahd measured several <br />cross-sections o eat pt e. <br />Data Summary <br />(Reference any tables, diagrams or maps attached) See Topsoil Measurements File. <br />Calculated volume of Topsoil Stockpile 8 was 60,000 cubic yards ;'Peabody volume estimate <br />was cu tc yar s. <br />a cu a e vo ume o opsoil Stockpile 13 was 102,00 cubic yards; Peabody volume estimate <br />was cu tc yar s. <br />Narrative Evaluation of Compliance <br />By either MLRD or Peabody volume estimates, there is presently enough topsoil to meet <br />* A separate tracking sheet should be filled out for each area and compliance topic <br />evaluated. <br />** If applicable <br />/ern <br />2807E <br />