My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52008
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:02 PM
Creation date
11/23/2007 7:17:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
8/2/1989
Doc Name
OPERATION STATUS PERMIT C-81-047
From
BLUE RIBBON COAL COMPANY
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiuiiu iii <br />blue <br />cb~bon <br />1 company <br />blue ribbon coal company <br />p.o. box 1352 <br />palisade, Colorado 81526 <br />(303) 464-7951 <br />July 31, 89 <br />Matthew S. Hayes <br />Mined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street _ <br />Denver, Colorado 80203-2273 <br />Re: Operation Status; <br />Permit C-81-047 <br />AUG ~ ~ggg <br />MINED /-~+iv;, <br />RECLAMATIG~; Jly, ~rv,,l <br />This letter is written to inform the Division of Blue Ribbon's <br />schedule for maintenance activities during a typical year. <br />Maintenance activities can be defined as cleaning ditches and <br />ponds, repair of rills and gullies, weed control, and any other <br />work required by the permit. <br />Nearly all maintenance is scheduled in the time period from April <br />through September of each year. No active work occurs on site <br />From October through March because the mine site is typically <br />covered with snow during most of this period. The exception to <br />this is the scheduled monitoring of the surface water, ground <br />water and stability monuments which is performed during the <br />fourth and first quarter of each year. <br />If you need any addition information regarding Blue Ribbons' <br />schedule for monitoring and maintenance, please let me know. <br />Sincerely, <br />~~~i~ <br />Jim Stover, P.E. <br />Chief Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.