Laserfiche WebLink
J ~ - <br />How has the permittee demonstrated that all existing unreclaimed areas are necessary for the <br />mining operation to resume? <br />c <br /> <br />Do you concur that all existing unreclaimed arcs cannot be reclaimed at this time so that the <br />permittee can resume mining operations? Y N Explain. <br /> <br />If mining operations do not start up again, is there material available on the unreclaimed portion of <br />the affected area to completely backfill the current pit? Y N If not, explain how the pit will <br />be backfilled. <br />~~ <br />What activities do you anticipate will continue during TINA? Backfilling & Grading <br />Resoiling_, Water Treatment _, Coal Waste Disposal ,Maintenance Work +~ c./ <br />None_ /~ycGo ino,vt~or,'~ r-- <br />Ls the site currently in compliance with all performance standards and permit cond' ' ns, including <br />plans for long-term storage or handling of any toxic oracid-producing material?~N <br />If no, explain: <br />~ rLS <br />How is the site effectively secured from vehicle access? ~~S ' ~~Q",~~ <br />Do any hazards to public safety exist on the site that should require that specific precautions be <br />taken by the pemrittee? Y N Describe: <br />Based on site conditions, including the necessity of <br />propose to inspect the site to ensure continued coml <br />Other Please Specify C^_ <br />I recommend that this TINA notification dated <br />Reasons: <br />Inspector <br />Date <br />water treatment, how often~6 you <br />urnn}h~u (1noAnrlu ~// <br />be: accepted not accepted <br />This TINA notification is accepted unaccepted or accepted _ under the following <br />conditions: <br />Field Team Manager: <br />Date <br />