My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51934
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:00 PM
Creation date
11/23/2007 7:14:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/16/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^r--> <br />Golder <br />~SOClc'iteS <br />September 10, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Project No,: 043-2170 <br />RE: Summary No. 17: August 29 through September 4, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of August 29 through <br />September 4, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 41° F to 49° F, and highs ranged from 59° F to 78° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on five days of this seven-day <br />reporting period (August 30 through September 3, 2004). Poly-Flex conducted Phase Nc construction <br />activities on five days of this seven-day reporting period (August 30 through September 3, 2004). <br />Phase Nc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase <br />Nb /Phase Nc tie-in area above the LOB. <br />Ames continued excavation and construction of two Leak Detection Trenches (LDT) in the eastern <br />portion of the Phase Nc VLF. Ames constructed approximately 100 feet of LDT during this reporting <br />period. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase Nc OSA, on the <br />eastem portion of the VLF. SLF material was tested, conditioned, reworked, retested, and maintained <br />Phase IVc 17 August 29-September 4, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.