My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51922
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:59 PM
Creation date
11/23/2007 7:14:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
3/28/1994
Doc Name
MINING PERMIT (Dated 2/28/94 to 2/28/99)
From
BASIN RESOURCES
To
DMG
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIDER TO MINING PERMIT <br />Permit Date: January 25 <br />Permit No: C-81-012 <br />1994 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. 2(46) <br />IMMEDIATELY FOLLOWING STREAM CHANNEL RELOCATION CONSTRUCTION AND BEFORE <br />RE-ROUTING THE PURGA70IRE RIVER BACK INTO ITS PERMANENT BANKS, THE <br />PERMITTEE MUST COMPLETE A SURVEY OF THE NEWLY CONSTRUCTED CHANNEL. THE <br />COMPONENTS OF THE SURVEY ARE DETAILED BELOW. <br />EACH FOLLOWING YEAR, DURING THE MONTH OF FEBRUARY (COINCIDING WITH LOW <br />FLOW), THE PERMITTEE MUST RE-SURVEY ALL OF THE FOLLOWING REQUIRED <br />COMPONENTS OF THE CHANNEL AND SUBMIT THIS INFORMATION TO THE DIVISION <br />BY MAY 1 OF EACH YEAR. <br />FIVE CROSS-SECTIONAL SURVEYS OF THE STREAM RELOCATION, TO BE <br />AGREED UPON BY THE DIVISION PRIOR TO THE SURVEY. <br />A LONGITUDINAL PROFILE OF THE STREAM BED FROM 50 FEET ABOVE <br />THE BRIDGE CROSSING THE PURGATOIRE RIVER, EXTENDING TO 100 FEET <br />BELOW THE STREAM RELOCATION SECTION. <br />A MONUMENT TO BE <br />PURGATOIRE RIVER <br />LOCATION FOR THE <br />MONUMENT MUST BE <br />WILL OCCUR. <br />Stipulation No. 9A <br />PLACED ON THE NORTH BANK OF THE RELOCATED <br />IN THE STRAIGHT PORTION OF THE CHANNEL RE- <br />PURPOSE OF MEASURING BANK MOVEMENT. THIS <br />PLACED IN AN AREA WHERE NO FUTURE DISTURBANCE <br />THE PERMITTEE WILL CONTINUE TO MONITOR THE SPRINGS NUMBERED 12 THROUGH <br />20 IN AUGUST OF EACH YEAR AND SUBMIT AN ASSESSMENT OF THE SIGNIFICANCE <br />OF THE SPRINGS AND SEEPS ON SURFACE FLOWS, IRRIGATION PRACTICES, LIVE- <br />STOCK WATERING, WILDLIFE WATERING, AND DOMESTIC USE. THIS INFORMATION <br />WILL BE SUBMITTED WITH THE ANNUAL HYDROLOGIC REPORT. <br />Stipulation No. 14 <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER CIRUELA CANYON AND APACHE <br />CANYON DRAINAGES, THE PERMITTEE MUST COLLECT DATA ON THE QUANTITY OF <br />WATER FLOWING IN THESE DRAINAGES. MONITORING MUST BE SUFFICIENT TO <br />DIFFERENTIATE SEASONAL FLOW VARIATIONS. <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER PETE CANYON, THE PERMITTEE <br />SHALL PROVIDE A DESCRIPTION OF STREAM FLOW CHARACTERISTICS AND WATER <br />USE IN PETE CANYON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.