My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51905
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:59 PM
Creation date
11/23/2007 7:13:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
5/27/1982
Doc Name
RESPONSE TO STIPULATIONS BEAR 3 OPERATION
From
ACZ INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ III IIIIIIIIIIIII III ~ <br />~ ~ ~ ~r~G. <br />ENGINEERING ANDENVIRONMEN7AL DIVISION <br />)]) L IN[OLN AVE. <br />P O. 00% ))>V61 <br />STEAMBOAT SPRING S. CO BOA)) <br />May 27, 1982 <br />P1r. Dan Mathews <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Response to Stipulations - <br />Bear No. 3 Operation <br />Dear Dan: <br />X03/879-6260 <br />Craig Springer of the Bear Coal Company and I appreciated the <br />opportunity to meet with you at the mine site on Monday morning, Play 24, <br />1982. This letter will confirm the discussion at our meeting and <br />contains responses to the stipulations given to Bear Coal Company. <br />The basic purpose of the meeting was to discuss the measures to be <br />undertaken by the Bear Coal Company in response to the stipulations <br />made on the approval to the permit. Although responses to all the <br />stipulations are included for your review and approval, the two <br />most critical stipulations to be approved are: <br />• The drainage and sediment control plan as <br />submitted herein so that the Bear Coal Company can <br />initiate construction of the plan immediately upon <br />final approval of the permit. <br />• The support structures for the stability of the portal <br />face-up area so that the Bear Coal Company can <br />initiate construction of the necessary retaining walls <br />and related aspects upon final permit approval. <br />The following are the responses to the various stipulations to the <br />Bear Coal Company permit approval included in the Proposed Decision and <br />Findings of Compliance Document of the Colorado I•tined land Reclamation <br />Division ("Division"): <br />Stioulation No. 1 <br />In discussions previously held with P1r. Fred Banta and h1r. Dan I.lathe~•~s <br />of the Division, representatives of the Bear Coal Company suggested that <br />a series of sediment control devices be utilized at tfie Bear No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.