My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51884
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:58 PM
Creation date
11/23/2007 7:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
2/1/2007
Doc Name
East Panel Slide - Agapito Interim Report
From
Trapper Mining Inc
To
DRMS
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGAPITO ASSOCIATES, INC. <br />715 HORIZON DRIVE GOLDEN OFFICE <br />SUITE 340 303.271.3750 <br />GRAND ,JUNCTION, CO 81606 <br />USA CHICAGO OFFICE <br />VOICE 970.242.4220 630.792.1520 <br />www.agapito.com <br />February 1, 2007 534-16-T4 <br />Mc Jim Mattern <br />Trapper Mining Company <br />P. 0. Box 187 <br />Craig, CO 81626 <br />Re: Interim Report of G-Pit and Pit Stability Analyses-Tasks 3 & 4 <br />Dear Jim, <br />On October 11, 2006, Dr. John Tinucci of Agapito Associates, [nc. (AAI), made a site <br />visit to the Trapper Mine to examine a large landslide that had occurred over the weekend of <br />October 8, 2006, in the G-Pit and K-Pit areas of the mine. Apost-event, field trip report was <br />issued to document observations from geotechnical and mining perspectives and to provide a <br />discussion on likely conditions leading to the event.) Since this site visit, modeling analysis of <br />G-Pit stability has been completed as well as analysis of Z-Dip Pit. <br />The purpose of this report is to summarize the modeling results and address questions <br />raised by Colorado Division of Reclamation, Mines, and Safety (DRMS) in their November 24, <br />2006, letter to the mine owner, Trapper Mining, [nc. (TM[), about expected ground conditions at <br />Z-Dip Pit. For clarity, numerical modeling results are presented first prior to addressing specific <br />questions from DRMS. This will provide sufficient background to help the responses to make <br />more sense. <br />The modeling results documented in this report provide <br />• Our understanding of conditions leading to landslide <br />• Demonstrate our confidence in being able to predict the behavior of the next phase of <br />Z-Dip Pit mining <br />• Help guide future geotechnical investigation activities and mine planning activities <br />associated with mining G-Pit area <br />• Our responses to DRMS's questions <br />I Agapito Associates, Inc, (2006), "Trip Report on GPit Landslide of October 8, 2006," prepared for Trapper <br />Mining, Inc, November 30. <br />Mining & Civi[ Engineers & Geologists <br />GEOENGINEERING MINING ENGINEERING CIVIL ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.