Laserfiche WebLink
I~~ 1~~I~~1~~I I <br />0 <br />- °Orh~oe c~~ <br />January 28, 1981 <br />~orchest~r Cmal Compan~ <br />Colorado Operations <br />2795 Skyline Court <br />Grand Junction, CO 81501 <br />(303) 245-6370 <br />Mr. Pete Evans <br />Colorado Mined Land Reclamation <br />1313 Sherman Street - Room 423 <br />Denver, Colorado 80203 <br />RECEIVED <br />JAN 3 0 ':;o i <br />MINED LAND RFCIAMATION-COAL <br />COLD DEPT. OF NATURAL RESOURCES <br />SUBJECT: 'GEC Minerals Request to Construct a Diversion Ditch Across the <br />Dorchester lil Permit Mine Boundary and Land Leased by Dorchester <br />Coal Co. in Order to Discharge into the Magpie Creek Diversion <br />Dear Pete: <br />The enclosed map shows where Dorchester Coal envisions that the diversion ditch <br />would be located. <br />Dorchester Coal Company grants permission for GEC Minerals to construct (under <br />the following conditions ONLY) a diversion ditch within the permit boundary <br />for the Dorchester No. 1 Mine: <br />1. That the diversion ditch must meet all requirements of Rules 2 and 4 of the <br />1980 Regulations of the Colorado Mined Land Reclamation Board for Coal <br />Mining, specifically 4.05.3, and that the-proposed diversion shall be <br />approved in writing by CMLRB prior to construction. <br />2. GEC must agree in writing to reclaim the diversion ditch and all other <br />disturbances created during its construction. <br />3. A plan of reclamation activities and a schedule shall also be provided <br />to Dorchester Coal Company within 30 days of the receipt of this letter. <br />If you have any questions, please feel free to call me. <br />Sincerely, <br />Darrel Hespe <br />Environmental Coordinator <br />DH:sh <br />ENC <br />~~ <br />A Subsidiary o/ Dorchester Gas Corporation <br />h ..,, I <br />~, <br />