:, <br />final channel shaping and riprap installation has not yet been initiated. Grade of the top of pile below the <br />new channel excavation appears to be substantially in compliance with the approved fmal design. The <br />existing upper diversion ditch upslope from the new excavation is still intact, and is [o remain in place until <br />the new diversion is completed. <br />Other Projects <br />I had noted during the bond release inspection on August 14 that the concretewingwalls at the upper dip- <br />section crossing of Coal Creek had been completed in appazent compliance with the approved design. <br />BLM representatives present during the inspection observed thewingwalls and indicated their concurrence. <br />There appeared to have been no further reclamation work completed on CRDA-I, the conveyor condor, or <br />other areas at the Roadside South Portals area or North Portal Area. Reclamation performed since I <br />previously inspected the site on August 24 appears to have been limited to the wash plant area facilities <br />demolition and the CRDA-2 grading work. <br />