My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51677
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:50 PM
Creation date
11/23/2007 6:59:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
7/21/1995
Doc Name
WEST ELK MINE PN C-80-007 UPDATE ON MATERIALS STORAGE BENCH MB-1 AS-BUILT AND BOREHOLE COMPLETION &
From
MOUNTAIN COAL CO
To
MLR
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III IIIIIIIIIIIII III <br />999 <br />Mountain Coal Company <br />West Elk Mine <br />Post Once amc 591 <br />Somerset, Cokredo 81434 <br />Teleplcne 9709?95075 <br />Fa 970 9?D5595 <br />RF(;EIVED <br />July 19, 1995 <br />Ms. Christine ]:. Johnston <br />DIVISION OI' MINERALS AND GEOLOGY <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />/\ <br />JUL 21 1995 <br />Division of mmerdis & Geology <br />Re: West Elk Mine, Permit No. C-80-007, Update on Materials Storage Bench, MB-1 As- <br />Built, and Borehole Completion & Location (MR 124) Projects <br />Dear Christine <br />Due to differing circumstances, the above-referenced projects have not yet been completed, but <br />Mountain Coa] Company (MCC) has scheduled this work. As you know, the surface of the <br />Materials Stor;tge Bench (MSB) has been saturated since thawing this Spring. MCC has been <br />unsuccessful in drying the road base and surface gravel by windrowing the surface layers. MCC <br />received proposals last week from several contractors to excavate the wet material, replace and <br />compact dry material ,and surface the MSB by the end of September. Until this work is <br />completed, fiord grading and shotcreting of drainage ditches in the approved configurations <br />cannot be com~~leted. Positive drainage will be maintained in the preliminary ditches currently in <br />place. <br />MCC has contracted with Westaz Engineers, Inc. to complete the certified as-built drawing for <br />MB-I by the rriddle of August. Utilizing that drawing, Greystone Development Consultants, Inc. <br />will prepaze thr; as-built drainage designs for the pond by the end of August. Per MR 109, the <br />dike was added to pond MB-1 to facilitate the lining of the pond. You may recall from that <br />revision that there is more than enough capacity in each "cell" of the pond to contain and treat the <br />required inflows. The revision to be submitted with the as-builts will make the dike a permanent <br />structure and n;-verify the capacities of both of the pond cells. <br />MCC appreciates the reminder of the borehole map and completion information required for MR <br />124. This information had been inadvertently misplaced. MCC is in the process of adding the <br />locations of thc: boreholes that were completed as piezometers to Map 53. A summary of the <br />completion infrrrmation will be provided for inclusion in Exhibit 12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.