Laserfiche WebLink
<br />dumped material.) A low ground pressure dozer is co-located in the area and pushes between <br />dumping of the trucks. The dozer will be maintaining the road at the approved thickness as well <br />as pushing the material away from the road. Thus, the roadway thickness is always observed <br />atld~is actively maintained by the dozer whenever required. <br />John Hardaway <br />Ma ager Environmental Affairs <br />Attachment: a/s <br />FILE: CC&VSTIP.006 <br />2 <br />