My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51620
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:48 PM
Creation date
11/23/2007 6:57:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
10/30/1995
Doc Name
COLOWYO COAL CO C-81-019 OCTOBER 11 1995 DIVISION INSPECTION FOLLOW UP INFORMATION
From
COLOWYO COAL CO LP
To
DMG
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiniiiiiiiii iii <br />COAL <br />COMPANY LP. <br />An affiliate of Kennecott Energy <br />and Coal Company <br />Ms. Erica Crosby <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver Co. 80203 <br />Re: Colowyo Coal Company, C-81-019 <br />October 11, 1995 Division Inspection <br />Follow up Information <br />Dear Ms Crosby: <br />~~.1~~ <br />0~ 3V01995 <br />w34~°° °t ~~~~eta15 ~Ueo~o9Y <br />Ory <br />5731 State Highway 13 <br />Meeker. Colorado 81641 <br />(303) 824-4451 <br />(303) 824-4459 FAX <br />October 27, 1995 <br />The purpose of this letter is to provide some follow up comments and information with <br />regard to the cited Division inspection. <br />The Division has recommended that maintenance be performed on the Warehouse, Streeter <br />and Gulch A pond emergency spillways. We concur with the Division with regard to the Gulch A <br />and Warehouse ponds and a contractor has been contacted to complete the work as soon as <br />possible. We do not anticipate that the November 15, 1995 deadline is a problem unless we <br />encounter adverse weather conditions which preclude completion of the project. <br />Upon further review of the Streeter pond, the rock material in the spillway appears quite <br />competent and also supports a good vegetative cover. As such we doubt that maintenance is <br />necessary at this time. Mr. Mathews also indicated concurrence that there was little evidence to <br />suggest that we should disturb the Streeter pond spillway. We therefore, do not have any <br />immediate plans at this time to disturb the Streeter Pond emergency spillway. We will however, <br />pay special attention to the spillway during future inspections. <br />One additional item for the Division's information. The monitoring stakes for the south side <br />of the West Pit Pond have been installed and will be noted on all future pond inspections. <br />Please contact me if you nave any questions concerning these subjects. <br />Sincerely, <br />~GLYN ~ . '~y~ <br />Ja es A. Kiger O <br />Sr. Environmental Engineer <br />xc: R.G. Atkinson <br />files <br />
The URL can be used to link to this page
Your browser does not support the video tag.