My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51570
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:46 PM
Creation date
11/23/2007 6:55:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
5/16/2006
Doc Name
Proposed Decision & Findings of Compliance for SL7
From
Phase III on 185.5 cropland & 577.3 rangeland
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
may request a formal public hearing before the Mined Land Reclamation Board in accordance with <br />Rule 3.03.2(6). Public notice of this proposed decision will be published once per week for two <br />consecutive in the Craig Daily Press as soon as possible. Requests for public hearing must be <br />submitted to the Division in writing within thirty days following the first publication in the Craig <br />Daily Press. If no hearing is requested within that thirty days, the Division's proposed decision will <br />become final. <br />Tra er Mine C-1981-010 Bond Release Histo <br /> Ph ase I Pha se II Pha se III <br /> acres amount acres Amount Acres Amount <br />SL-01 2511.7 Liability only 1570.5 liability only <br />SL-02 319.5 liability only <br />SL-03 592.7 (1) <br />SL-04 1857.7 liability only <br />2 <br />SL-05 823.9 Liability only <br />3 <br />SL-06 819.1 liability only (4) <br />SL-07 762.8 (5) $371,146.00 <br />Total: 3335.6 3301.8 2615.5 <br />(I)The reclamation cost liability associated with this bond release was $1,857,688.00. However, the operator <br />did not request a reduction in the bond amount. <br />(2) The reclamation cost liability associated with this bond release was $82,659. However, the operator did not <br />request a reduction in the bond amount. <br />{3) Reclamation cost liability associated with the backfill portions of Pit D, Pit H, Pit F, and Pit A would have been <br />$7,908,600.00, based upon a cost per lineal foot measurement of the pit dimensions. The operator did not <br />request a reduction in the bond amount. <br />(4) The reclamation cost liability associated with this bond release was $2,587,606. The operator did not <br />request a reduction in the bond amount <br />(5) The Division estimated reclamation cost liability of tasks associated with this bond release was <br />$371,146.00. Acreage includes West Buzzard, East Buzzard and Elk reclaimed drainages. The operator <br />requested a reduction of $38,181.00. <br />Trapper Mine, SL-07 Findings l0 May 16, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.