Laserfiche WebLink
MLyLy~_eERML?___L49L <br />Permi i date _Jul~ Z9____, 190?_ Permi t No. _ C-033-81 <br />Permit expiration Uate _Ju1z119___, 1q 87 <br />THIS PE~2MIT is issued by the Mined Land Reclamation <br />Division, Department of Natural Resources, State of Colorado. <br />BLLLI9LS <br />C. wear Coal Company Inc_________ ("operator") desires to <br />conduct a mining operation known as the~azJ'I.tine__ ______ <br />for the purpose of extracting coal. <br />II. Un _ ?uly 19____-__, 198 ~, the Mined Land Reclamation <br />Division ("the division") approved operator's application <br />for this permit, fixed the amount of bond and directed that <br />this permit be issued upon the filing with the d;visian of <br />bond in the amount so fixed in corm and substance approved <br />by the division, and such bond has been so furnished. <br />II[. Un _ Mai 10________, 198 ~r the division made the f01- <br />lowing findings: <br />a) the permit application is accurate and contains <br />all information required under i..R.S. 1973, 34-33-„~ 1 ES <br />~tp. and regulations promulgated thereunder and that all <br />the requirements of article 33 of title 34, C.R.S. 1973 <br />("such article") for the isSUe Of a permit have been complied <br />with; <br />b) The applicant has demonstrated that reclamation <br />as required by such article can be accomplished under the <br />reclamation plari contained in the permit application; <br />c) The assessment of the probable cumulative impact <br />of all anticipated mining in the area on the hydrologic bal- <br />ance specified in section 34-33-110(2) (1) has been made by <br />the division and the proposed operation thereof has been <br />designed to prevent material damage to hydrologic balance <br />outside the permit area; <br />d) Granting the permit will not conflict with any <br />designation decision issued pursuant to section 522 of the <br />federal "Surface IAininy Control and Reclamation Act of 1977", <br />as amended, (P.L. 95-87), nor is the area proposed to be <br />mined within an area under study for unsuitability designa- <br />tion in an administrative proceeding commenced pursuant to <br />section 34-33-126 or section 522 of said P.L. 95-87. <br />e) ([) Unless the proposed operation was an oper- <br />ation which produced coal in commercial quantities in the <br /> <br />