Laserfiche WebLink
12. WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A PLAN <br />TO THE DIVISION FOR PLACEMENT AND STORAGE OF ALL NON-COAL WASTES IN A <br />DESIGNATED PORTION OF THE PERMIT AREA TO ENSURE THAT LERCHRTE AND <br />SURFACE RUNOFF DO NOT DEGRADE SURFACE OR GROUND WATER. A PLAN FOR <br />FINAL DISPOSAL OF NON-COAL WASTES IN A DESIGNATED DISPOSAL SITE WILL <br />ALSO BE SUBMITTED. <br />13. WITHIN ONE MONTH OF PERMIT ISSUANCE, AN OPERATION DESCRIPTION, A <br />SEDIFIENT CONTROL PLAN, AND A RECLAMATION PLAN FOR THE LOADOUT WILL <br />BE SUBMITTED TO THE DIVISION AND INCORPORATED INTO THE PERMIT. <br />14. WITHIN TWO MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />TO THE DIVISION AN ACCEPTABLE PLAN FOR SNOW RE190VAL AND DISPOSAL, <br />TO INSURE THAT SNOW AND ROAD SURFACING MATERIAL IS DISPOSED OF IN <br />AN APPROPRIATE AREA, AND DOES NOT INTERFERE WITH SURFACE DRAINAGE. <br />15. THE DIVISION DIRECTS BEAR COAL COMPANY TO SUBMIT A SUBSIDENCE MONITORING <br />PROGRAM FOR REVIEW AND APPROVAL BY THE DIVISION. THIS PROGRAM SHALL <br />INCI:UDE THE INSTALLATION OF APPROPRIATE PROFILE LINES OF PREMANENT <br />MONUMENTS, CAPABLE OF RESISTING NORMAL TRAFFIC AND METEOROLOGICAL <br />PHENOMENA. MONUMENTS SHALL BE LOCATED TO MONITOR POSSIBLE SUBSIDENCE <br />OF AREAS DESIGNATED FOR THE INITIATION OF RETREAT OR SECONDARY <br />EXTRACTION. THESE PLANS SHALL INCLUDE A TYPICAL MONUMENT DETAIL <br />DRAWING. THIS SUBSIDENCE MONITORING PROGRAM SHALL BE SUBMITTED, FOR <br />REVIEW BY THE DIVISION, WITHIN 30 DAYS FOLLOfING PERMIT APPROVAL. <br />FURTHER, THE APPROVED SUBSIDENCE MONITORING MONUMENTS SHALL BE INSTALLED <br />AND INITIALLY MONITORED PRIOR TO THE COMMENCEMENT OF RETREAT OR <br />SECONDARY EXTRACTION WITHIN THE BEAR NO. 3 t4INE. FOLLOWING THE <br />INITIAL MONITORING, THE SUBSIDENCF. MONUMENTS SHALL BE MONITORED ON <br />A SEMI-ANNUAL BASIS, AND THE RESULTS OF THAT MONITORING SHALL BE <br />SUBMITTED TO THE DIVISION WITHIN 30 DAYS FOLLOWING COMPLETION OF <br />EACH MONITORING SURVEY. <br />Note: Stipulations No. 1, 2, 3, 7, 10, 12 and 14 have been fully resolved <br />as of July I9, 1982. Plans and information specified by these <br />stipulations have been submitted to the Division and incorporated <br />into the permit. <br /> <br />