Laserfiche WebLink
<br />-6- <br />r~ <br />C) QUALITY DATA, INCLUDING pH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE <br />AND THE SOURCE (I. E., FAULTS, FRACTURES, DRAINAGE FROM SEALS, ETC.) <br />FOR ALL POINT SOURCE INFLOWS NOT PREVIOUSLY MAPPED. <br />D) THE SUBMITTAL OF A CONTINUOUS RECORD OF MINE DISCHARGES FOR THE <br />YEAR AND A HYDROGRAPH OF FLOWS. <br />Stipulation No. 14: <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER CIRUELA CANYON AND APACHE <br />CANYON DRAINAGES, THE PERMITTEE MUST COLLECT DATA ON THE QUANTITY OF <br />WATER FLOWING IN THESE DRAINAGES. MONITORING MUST BE SUFFICIENT TO <br />DIFFERENTIATE SEASONAL FLOW VARIATIONS. <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER PETE CANYON, THE APPLICANT <br />SHALL PROVIDE A DESCRIPTION OF STREl4M FLOW CHARACTERISTICS AND WATER USE <br />IN PETE CANYON. <br />THE PERMITTEE SHALL PROVIDE AN ASSESSMENT OF THE PROBABLE HYDROLOGIC <br />CONSEQUENCES OF SECONDARY OR RETREAT MINING ON THE QUANTITY AND QUALITY <br />OF SURFACE WATER IN CIRUELA, APACHE AND PETE CANYONS. <br />ALL MONITORING MUST CONTINUE UNTIL DISCONTINUATION IS APPROVED BY THE <br />DIVISION IN WRITING. <br />Stipulation No. 15: <br />THE PERMITTEE SHALL SUBMIT AN ANNUAL HYDROLOGIC MONITORING REPORT FOR <br />THE ALLEN MINE. THE MONITORING REPORT SHALL INCLUDE A SUMMARY AND <br />ANALYSIS OF DATA COLLECTED DURING THE YEAR, INCLUDING: 1) WATER USED IN <br />THE MINING OPERATION; 2) MINE WATER DISCHARGES TO RECEIVING STREAMS <br />(QUANTITY AND QUALITY); 3) MINE WATER INFLOWS (ANNUAL MINE INFLOW <br />STUDY); 4) STREAM FLOWS AND QUALITY; 5) IMPACTS TO THE QUALITY AND <br />QUANTITY OF ALLUVIAL AND BEDROCK AQUIFERS; AND 6) IMPACTS TO SPRING <br />FLOWS AND QUALITY. THE MONITORING REPORT SHOULD INCLUDE A DESCRIPTION <br />OF MITIGATIVE MEASURES TAKEN TO MINIMIZE DISTURBANCE TO THE PREVAILING <br />HYDROLOGIC BALANCE. THE MONITORING REPORT SHALL BE ADEQUATE TO PLAN FOR <br />MODIFICATION OF SURFACE OR UNDERGROUND MINING ACTIVITIES, IF NECESSARY, <br />TO MINIMIZE DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. <br />Stipulation No. 16: <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT TO THE <br />DIVISION FOR APPROVAL, A DETAILED PLAN DEMONSTRATING HOW THE ESSENTIAL <br />HYDROLOGIC FUNCTIONS OF THE ALLUVIAL VALLEY FLOOR IN THE AREA DISTURBED <br />BY SURFACE OPERATIONS WILL BE PRESERVED OR RESTORED. THE ESSENTIAL <br />HYDROLOGIC FUNCTIONS OF THE DISTURBED ALLUVIAL VALLEY FLOOR t4UST BE <br />PRESERVED OR RESTORED TO A CONDITION SIMILAR TO THAT OF REPRESENTATIVE <br />ADJACENT UNDISTURBED ALLUVIAL VALLEY FLOORS IN THE STONEWALL VALLEY. <br />THIS PLAN WILL BE SUBMITTED AS A REVISION TO THE PERMIT. <br />