Laserfiche WebLink
<br />-9- <br /> <br />NO PESTICIDES OR HERBICIDES WILL BE USED ON REVEGETATED AREAS <br />WITHOUT THE EXPRESS WRITTEN APPROVAL OF THE DIVISION. <br />THE PERMITTEE WILL CONDUCT A SOIL TESTING PLAN, EVALUATING THE <br />MAJOR SOIL NUTRIENTS OF NITROGEN, PHOSPHORUS, AND POTASSIUM, PRIOR <br />TO SEEDING. RESULTS WILL BE FORWARDED TO THE DIVISION. AUGMENTED <br />FERTILIZATION WILL BE CONDUCTED AS REQUIRED BY THE DIVISION. <br />Stipulation No. 24: <br />THE PERMITTEE SHALL DEVELOP AND SUBMIT A REVISION CONTAINING A SPECIFIC <br />RECLAMATION AND REVEGETATION PLAN FOR THE WILLOW CARR RIPARIAN AREA. <br />THIS PLAN SHALL ADDRESS AND DISCUSS, AT A MINIMUM, THE GRADING Of BANKS <br />ALONG THE PURGATOIRE RIVER, THE TOPSOILING OF THIS AREA, THE SEED MIX TO <br />BE USED, REESTABLISHMENT OF WOODY SPECIES ALONG THE RIVER, AND ALL <br />MEASURES TO RESTORE, ENHANCE, OR MAINTAIN THE RIPARIAN COMMUNITY. THIS <br />PLAN SHALL ALSO DEVELOP AND PROPOSE SUCCESS CRITERIA TO BE APPLIED TO <br />THE WILLOW CARR RIPARIAN AREA. THIS PLAN SHALL BE SUBMITTED TO THE <br />DIVISION NO LATER THAN 12 MONTHS AFTER PERMIT ISSUANCE. <br />Stipulation No. 25: <br />THE PERMITTEE SHALL SUBMIT AN ACCEPTABLE ANNUAL OR BIENNIAL REVEGETATION <br />MONITORING PLAN TO BE INITIATED UPON DIVISION APPROVAL. THIS PLAN SHALL <br />BE SUBMITTED TO THE DIVISION AS A REVISION NO LATER THAN 12 MONTHS AFTER <br />PERMIT ISSUANCE. <br />Stipulation No. 26: <br />THE PERMITTEE SHALL SUBMIT A REVISED BACKFILLING AND GRADING PLAN THAT <br />SPECIFICALLY ADDRESSES THE ELIMINATION OF ALL HIGHWALLS AND DEPRESSIONS, <br />AND THE BACKFILLING AND GRADING OF ALL CUT SLOPES AND BENCHES AT THE <br />ALLEN MINE. IN ADDITION, THIS PLAN SHOULD ADDRESS THE RECONSTRUCTION OF <br />THE MANY STREAM CHANNELS TRAVERSING THE SITE. A.i2•EVISED CONTOUR MAP, <br />USING CONTOUR INTERVALS OF TEN FEET, AND ADDITIONAL CROSS SECTIONS <br />DEPICTING THE POSTfiIINING TOPOGRAPHY SHOULD BE SUBMITTED. THE <br />POST-MINING CROSS SECTIONS SHOULD ALSO INDICATE PRE-MINING TOPOGRAPHY, <br />IF AVAILABLE, AND EXISTING TOPOGRAPHY. <br />THIS REVISION TO THE PERMIT SHOULD BE SUBMITTED FOR DIVISION APPROVAL <br />WITHIN 120 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 27: <br />WITHIN 120 DAYS OF PERMIT APPROVAL, THE PERMITTEE MUST EITHER: A) SUBMIT <br />A PLAN TO THE DIVISION FOR DEMONSTRATING THAT SUCCESSFUL REVEGETATION <br />CAN BE ACHIEVED WITH LESS THAN FOUR FEET OF THE BEST AVAILABLE <br />NON-TOXIC, NON-COMBUSTIBLE COVER MATERIAL; OR B) SUBMIT A PLAN FOR <br />RECLAMATION OF THE WASTE DISPOSAL PILE USING FOUR FEET OF THE BEST <br />AVAILABLE NON-TOXIC, NON-COMBUSTIBLE COVER MATERIAL. THIS PLAN MUST <br />INCLUDE A DESCRIPTION OF THE FOUR FEET OF COVER hATERIAL TO BE USED, <br />INCLUDING, AT A MINIMUM, SOURCE AND GEOCHEMICAL CHARACTERISTICS. <br />