Laserfiche WebLink
NOT INTERRUPT, DISCONTINUE, OR PRECLUDE FARMING ON THE ALLUVIAL <br />VALLEY FLOOR <br />NOT CAUSE MATERIAL DAMAGE TO THE QUANTITY OF GROUND WATER THAT <br />SUPPLIED THE ALLUVIAL VALLEY FLOOR <br />PRESERVE THE ESSENTIAL HYDROLOGY FUNCTIONS OF THE ALLUVIAL VALLEY <br />FLOOR <br />Stipulation No. 28 <br />THE PERMITTEE SHALL PERFORM A SURVEY OF THE FIVE POTENTIALLY AFFECTED <br />ADOBE CONSTRUCTED HOUSES ON A QUARTERLY BASIS, IN CONFORMANCE WITH THE <br />REQUIREMENTS OF RULE 2.05.6(6)(c)(i)(D) <br />Stipulation No. 35 (Technical Revision 4) <br />TOPSOIL SHALL BE STRIPPED FROM AREA 1 (WEST) PRIOR TO THE MOVEMENT OF <br />WASTE ACROSS THIS AREA. STRIPPING AND STOCKPILING OF ALL TOPSOIL AND <br />SUBSOIL FROM AREAS 1 (EAST), 2, AND 3 AS IDENTIFIED ON FIGURE 1, THE MAP <br />OF THE PROPOSED COAL PROCESSING WASTE PILE, IS REQUIRED PRIOR TO THE <br />PLACEMENT OF WASTE DURING THE SUBSEQUENT CONSTRUCTION OF THE WASTE PILE. <br />A MINIMUM 25' BUFFER ZONE, FROM WHICH TOPSOIL AND SUBSOIL HAVE BEEN <br />REMOVED, SHALL BE MAINTAINED BETWEEN THE COAL PROCESSING WASTE AND THE <br />UNDISTURBED PORTIONS OF THESE AREAS. PRIOR TO STOCKPILING SUBSOIL IN THE <br />LOCATION INDICATED ON FIGURE 1, THE TOPSOIL PRESENTLY EXISTING AT THAT <br />LOCATION SHALL BE TRANSFERRED TO ANOTHER AREA APPROVED BY THE DIVISION. <br />Stipulation No. 36 (Technical Revision 4) <br />WITHIN 60 DAYS FOLLOWING COMPLETION OF THE CONSTRUCTION OF THE DRAINAGE <br />DITCHES APPROVED AS PART OF TECHNICAL REVISION 04, WY014ING FUEL COMPANY <br />WILL PROVIDE THE DIVISION WITH A POST-CONSTRUCTION MAP OF THE LOCATION OF <br />THE DITCHES AND OF THEIR BEDROCK AND RIPRAPPED SECTIONS TOGETHER WITH <br />REPRESENTATIVE CROSS-SECTIONS, RIPRAP SIZING, AND AS-BUILT ENGINEERING <br />CERTIFICATIONS. CALCULATIONS ACCEPTABLE TO THE DIVISION SHALL ALSO BE <br />PROVIDED TO DEMONSTRATE THAT ALL SECTIONS OF THE CHANNELS CAN SAFELY PASS <br />THE RUNOFF FROM A 100 YEAR 24 HOUR PRECIPITATION EVENT. i <br />Stipulation 40 (Minor Revision 5) <br />PRIOR TO THE ACTUAL VENTING OF METHANE GAS FROM THE MINE WORKINGS TO THE <br />ATMOSPHERE BY MEANS OF PROPOSED VENTILATION HOLES E-1 and E-2, WFC WILL <br />SECURE THE NECESSARY PERMIT (OR A WRITTEN PERMIT EXEMPTION) FOR SUCH <br />VENTING FROM THE APPROPRIATE DIVISION OF THE COLORADO DEPARTMENT OF <br />HEALTH. <br />Stipulation No. 43 (Technical Revision 6) <br />UPON CONSTRUCTION AND PRIOR TO USE OF POND 005, THE OPERATOR WILL LINE <br />THE INTERIOR EMBANKMENTS OF THE POND WITH BENTONITE CLAY OR A SUITABLE <br />LINER APPROVED BY THE DIVISION. <br />-7- <br />