My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51426
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:40 PM
Creation date
11/23/2007 6:47:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
10/28/1998
Doc Name
Status of remaining RECLAMATION WORK AT GRASSY GAP
From
DMG
To
JIM MCARDLE
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III II IIII 1111111111 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DefJ.lllmenl OI NJlural RPSOVrl eS <br /> <br />I } 13 Sherman 51., Room 21 S ~ <br />Denver, Colorado 80203 II~~~ <br />Phone: 13071 d66-3567 <br />fA%. 13031 AS'_-A106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />Date: October 23, 1993 <br />To: Jim McArdle <br />1 <br />From: Dan Hernandez"~~ <br />Re: Reclamation Work at Grassy Gap <br />Rov Romer <br />Governor <br />tames S. LochheaA <br />E.ecwive Dueaor <br />Michael B. Long <br />Division Dnecmr <br />We currently hold $16,559 in forfeited bond monies for this site. Here's what remains to be done <br />(see attached memos from Janet & Byron): <br />Water from Pond 4 may be seeping out below the pond's embankment and possibly <br />contributing to a small slump downhill. Byron has suggested that the base of the primary <br />riser be grouted, that the pond be lined with bentonite, that the exit low-flow discharge plastic <br />tube be replaced with a metal pipe, and [hat the new metal exit pipe be extended to the base of <br />the slope. <br />2. A hairpin turn in Pit 4's access road needs reinforcement or repair. <br />3. A ditch along the access road to Pit 2/3 needs riprap and repair. <br />4. Spring water flow across the access road to Pit 2/3 needs managing (water bars, etc.). <br />I've attached copies of some recent inspection reports for Grassy Gap. These provide some <br />additional detail that may be useful. <br />If you have any questions, see me or Janet. <br />Cc: Janet Binns <br />Byron Walker <br />graS S yg apmOM:\oss\~ rc\grusygapmo. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.