Laserfiche WebLink
.. ~. <br />Stipulation No. 9 <br />THE PERMITTEE SHALL CONTINUE TO CONSULT WITH COLORADO DIVISIO~~ OF <br />WILDLIFE PERSONNEL (LOCAL DISTRICT WILDLIFE MANAGER OR AREA SIIPFP.VISOP., <br />DURANGO), AND NOTIFY THEM PRIOR TO ANY CHANGES IN BLASTI~~G OPERATIONS <br />WHICH MIGHT INCREASE NOISE LEVELS OR SEISMIC SHOf.K LEVELS. <br />ANY CHANGES IN BLASTING OPERATIONS WHICH MIGHT IP~CRFASF NOISE LEVELS OR <br />SEISMIC SHOCK LEVELS SHALL BE APPROVED BY THE DIVISION PRIOR TO THE <br />IMPLEMENTATION OF SUCH CHANGES. SUCH APPROVAL BY THE DIVISION WILL BF. <br />GRANTED ONLY AFTER CONSULTATION WITH AND APPROVAL BY THE APPROPRIATE <br />COLORADO DIVISION OF WILDLIFE PERSONNEL. <br />Stipulation No. 10 <br />THE DIVISION DIRECTS THE PERMITTEE TO VERIFY THE ACCURACY OF THE <br />OVERBURDEN/INTERBURDEN SWELL FACTOR AND BULKING PROJECTIONS FOR THE <br />CHIMNEY ROCK MINE. IN ORDER TO ACCOMPLISH THIS VERIFICATION, THE <br />PERMITTEE. SHALL COMPLETE AN ANNUAL SURVEY OF THE DISTURBED AREA. THE <br />COMPANY SHALL UTILIZE STANDARD AERIAL OP. FIELD SURVEY TFCHNIOUES IM <br />COMPLETING THE REQUIRED SURVEY. THE SURVEY MAP APID A REPOP.T ANALYZING <br />CONFORMANCE WITH THE AMENDED POST-MINING TOPOGRAPHY SHALL BE SUBMITTED <br />ANNUALLY TO THE DIVISION. <br />Stipulation No. 11 <br />ALL ACCESS AND LIGHT USE ROADS NEEDED FOR THE PERMIT REVISION PIO. 1 AREA <br />WILL NEED TO BE APPROVED BY THE DIVISION AS A TECHNICAL REVISION PRIOR <br />TO ANY SUCH ROAD CONSTRUCTION. <br />