My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51374
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:44:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
12/1/1998
Doc Name
PIPELINE INFORMATION SUMMARY
From
AMERICAN SODA LLP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />1 <br /> <br />L_J <br /> <br />3.3.3 Trenching Operations <br />After the working area is prepared, trenching operations will begin. Trenches <br />will be excavated with a backhoe along most of the pipeline corridor. Under <br />some circumstances, awheel-ditcher may be used. The wheel-ditcher can <br />excavate a trench width of approximately 28 inches although width will vary <br />with different types of ditchers or setups. Gentle topography and fine-textured <br />soils might allow use of awheel-ditcher, while a backhoe can be used in almost <br />all soils. Trenches will be open for several days (the estimated average is 5 days) <br />until the pipe is placed and backfilling is completed. <br />The depth of the trench will vary with the conditions encountered. The cover <br />from the top of the pipe to ground level will generally be 36 inches, except in <br />areas where significant rocks exist where this distance may be reduced to 30 <br />inches. Rock that is placed back into the trench will be crushed to a maximum <br />diameter of 5 inches. In some cases, the pipeline trench may be 5 to 10 feet deep, <br />e.g., where the proposed pipeline passes under existing pipelines, roads, or other <br />obstacles. <br />Ramps that can be negotiated by livestock or wildlife will be placed across the <br />trench at intervals not to exceed 1 mile wherever the continuous pipeline trench <br />is not interrupted by a road or pipeline crossing. The excavated trench will be <br />' inspected every morning for livestock or wildlife that may have fallen in during <br />the night. <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br />1 <br /> <br />Steep, rocky terrain has been identified at four locations: 1) at the upper end of <br />Hatch Gulch, 2) immediately south of the second Piceance Creek crossing, 3) at <br />the northern end of Barnes Ridge, and 4) at Davis Point. In rocky terrain, arock- <br />trencher (also known as a rock-saw or crock-hammer) will be used to minimize <br />environmental disturbance. Backhoe hydraulic rams will assist in rock <br />excavation where rock-trenchers are ineffective. No blasting is planned for <br />excavation of these areas because of the close proximity of the existing ngl <br />pipelines. A possible exception is the section off the east face of Davis Point, <br />which is a steep slope that is not in close proximity to any underground <br />pipelines. <br />• Pipelines and Facilities Crossings: Prior to conducting the centerline <br />survey, crews usually locate buried facilities to avoid damaging them during the <br />construction process. The Yankee Gulch Project pipelines will generally cross <br />beneath other pipelines and other utility lines. A backhoe and hand labor is used <br />to excavate the pipeline trench in such areas to allow passage of the new pipeline <br />under the existing pipelines. Additional TUAs will be necessary for these areas. <br />Affected ROW holders will be contacted prior to construction (see Section 3.1.1). <br />Locations of adjacent pipelines will be confirmed using the ONE CALL system or <br />similar underground utilities location system. This is intended to locate all <br />~ipeLre Woemavon Survrery 16 <br />YaWue GWch Sodium Mirmrals 14o~ect <br />Amman Soda. L LP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.