Laserfiche WebLink
.-~ ` <br />STATE OF COLIIIy~~~~~~~~~~~~~~~~ <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />FA x: 303 832-8106 <br />pF CO~ <br />F; Ri <br />*e o <br />r~~ <br />~ rB76 ~ <br />MINING PERMIT - COAL Roy Romer, <br />Govennr <br />Michael 8. Long, <br />Dins~an Director <br />Permit Date: August 18, 1992 Permit No. C-S1-035 <br />Permit Expiration Date: August 18, 1997 <br />THIS PERMIT is issued by the Mined Land Reclamation Division, Department of <br />Natural Resources, State of Colorado. <br />RECITALS <br />I. National King Coal ("operator") desires to conduct a mining operation <br />known as King Coal Mine for the purpose of extracting coal. - <br />II. On August 18, 1992, the Mined Land Reclamation Division ("the Division") <br />approved the operator's application for this permit, fixed the amount of bond <br />and directed that this permit be issued upon the filing with the Division of <br />bond in the amount so fixed in form and substance approved by the Division, <br />and such bond has been so furnished. <br />III. On August 12, 1992, the Division made the following findings: <br />(a) The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et sew. and regulations promulgated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />c"such article") for the issue of a permit have been complied with; <br />(b> The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the oermit area; <br />(d) Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />Reclamation Act of 1977", as amended, (P.L. 95-87), nor is the area proposed <br />to be mined within an a1~ea under study for unsuitability designation in an <br />administrative proceeding commenced pursuant to Section 34-33-126 or <br />Section 522 of said P.L. 95-87. <br />(e) (U Unless the prcposed operation was an operation which produced <br />coal in commercial quantities in the yeas preceding Auqust 3, 1977 and at that <br />time was located within or adjacent to alluvial valley floors, the proposed <br />surface coal mining operations would: <br />