My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51249
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:38:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
8/2/1990
Doc Name
Bid invitation - East Mine Reclaim
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/23/89 <br />If a three-way "Agreement for Reclamation Activities" is required, the <br />CONTRACTOR will be required to furnish lien waivers to the private landowner. <br />See No. 5 of the sample three-way "Agreement for Reclamation." The <br />landowner's address will be furnished to the CONTRACIOR with the Notice to <br />Proceed. <br />The STATE OF COLORADO must be named as an "Additional Insured" on the <br />certificate of insurance. BIDDERS ARE ADVISED TO CONSULT WITH THEIR INSURANCE <br />CARRIER CONCERNING THESE REQUIREMENTS. SUBMIT A BID ONLY IF YOU ARE PREPARED <br />TO COMPLETE THESE REQUIREMENTS. <br />6. PURCHASE ORDER CONTRACT AND BONDS <br />The bidder whose bid is accepted will, within ten (10) calendar days after <br />receipt of the notice of award, furnish labor and material payment and <br />performance bonds in the amounts of 100 percent and 100 percent, respectively, <br />of the original amount of the contract, pursuant to State Law, Title 24-105, <br />202-Z03, C.R.S. as amended. The bonds shall be submitted using the State <br />forms. A certified or cashiers check or bank money .order may be accepted in <br />lieu of the bonds. If a surety other than a bond is used, the State will hold <br />the surety for 90 days after the final settlement date. <br />When the insurance certificates and bonds are submitted to the (dined Land <br />Reclamation Division and found to be in order, the CONTRACTOR shall enter into <br />a written Purchase Order contract with the OWNER. <br />7. PROJECT SCHEDULE <br />The successful bidder shall, within ten (10) days after receipt of the Notice <br />of Award, and prior to issuance of a Purchase Order, furnish a plan for <br />construction of the work showing (1) the date(s) he expects to move various <br />pieces of equipment onto the work site, and (2) the dates and period(s) he <br />proposes to perform each phase of the project work. <br />8. NOTICE TO PROCEED <br />After a Purchase Order has been issued, the OWNER will issue Notice to <br />Proceed. Under no circumstances shall the CONTRACTOR begin work before a <br />Notice to Proceed is issued. <br />9. WORK PROGRESS <br />The CONTRACTOR agrees that work will be performed with due diligence in <br />accordance with good engineering and construction practices to the end that <br />the entire contract work shall be completed within the time specified in the <br />Special Conditions after receipt of the Notice to Proceed. It is expressly <br />understood and agreed, by and between the parties hereto, that the stipulated <br />performance time for completion of the work described is a reasonable time for <br />completion of the work, taking into consideration all factors, including <br />average climatic conditions prevailing in the area. <br />MLRD-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.