My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51217
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:37 PM
Creation date
11/23/2007 6:37:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
8/28/1991
Doc Name
EXTENSION OF DEADLINE FOR STIPULATION 17 REVISED MAGPIE CREEK CHANNEL DESIGN MODIFICATION OF ANNUAL
From
ENERGY FUELS COAL INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br />energy fuels coal, inc. <br />6outDlleltl mine • poet office Dos 448 • florence, coloretlo 87228 • (718) 784-0395 <br />Ms. Cathy Begej <br />Colorado Mined Land Reclamation Division <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />e~~~a~~~ <br />AU6 2 8 1991 ~ <br />Mined Land <br />Reclamation Division <br />August 22, 1991 <br />RE: 1) Extension of deadline for Stipulation No. 17: <br />Revised Magpie Creek Channel Design <br />2) Modification of Annual Submittal Date for Stipulation <br />No. 6: Annual Mine Inflow Report <br />Southfield Mine <br />File No. C-81-014 <br />Dear Cathy: <br />With this letter Energy Fuels Coal, Inc. (EFCI) is <br />requesting modification of submittal dates for Stipulation <br />Numbers 17 and 6 contained in its approved Colorado Coal Mining <br />and Reclamation Permit No. C-81-014. <br />EFCI requests that the submittal deadline for Stipulation <br />No. 17, currently due within 120 days of permit revision <br />approval, be changed such that the deadline is contingent on a <br />decision on Technical Revision No. 09: GEC Refuse Disposal Pit. <br />The technical revision application is currently under review by <br />the Division. <br />A portion of the drainage and sediment control designs for <br />the GEC pit impact the lower portion of the existing Magpie Creek <br />temporary diversion channel. Until the technical revision is <br />finalized and approved, EFCI cannot determine the appropriate <br />design for the upstream portion of the Magpie Channel referenced <br />in Stipulation No. 17. EFCI requests therefore that the <br />stipulation deadline be modified to coincide with the approval, <br />denial or withdrawal of Technical Revision No. 09. <br />EFCI also requests that the annual submittal date for <br />Stipulation No. 6, currently July 1, be revised to a submittal <br />date of August 1. This revised date is concurrent with the <br />annual submittal date for the Southfield's Annual Hydrology <br />Report. In this combined report, all required hydrologic <br />monitoring data can be compiled and discussed in one document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.