Laserfiche WebLink
CIRCES Cost Estimating Software <br />__... <br />PROJECT IDENTIFICATION <br />Task # : 036 <br />Date : 06/11/2007 <br />User : JRS <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :2007 Midterm Review <br />Task description : Backlill and Regrade Pond 5 <br />iOURLY CC~ulrmcni ~.v~i <br />Basic machine : <br />Cat D9R - 9SU (2005) <br />Horsepower : <br />405 <br /> 81ade type : Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 perday <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership costlhour : $72.92 NA <br /> OperatingcosUhour: $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total fleet cost/hour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br /> <br />factor <br />300 CCY <br />3 <br />: 1.125 volume : <br />3,712 <br />LGY <br />, <br />volume : <br />Source of estimated volume :Map 24 <br />Source of estimated swell factor :CAT Handbook ,:; <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 90 feet Material consistency : 0.90 <br />1 <br />00 (Cat HB) <br />) <br />(gen <br />Unadjusted hourly production : 1,351.7 LCY/hr Dozing method : . <br />1 <br />00 . <br />l <br />(av9 <br /> Visibility : . ~ <br /> Job efficiency : 0.83 (1 shiff/day, <br />Material consistency description : Spoil pile : 0.80 (fnd-rfl <br />Compacted fill or embankment Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 <br />87 <br />0 (Cat HB) <br />(Cat HB) <br />Average site altitude : 6,100 feet Material weight : . <br />1 00 (S/SUN) <br /> Blade type <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description <br />rth <br />75% E <br />Adjusted unit production : <br />525.63 <br />LCY/hr <br />a <br />Decomposed rock - 25% Rock, <br /> Adjusted fleet production : 525.63 LCY/hr <br /> <br />JOB TIME AND COST <br />i <br /> <br />1 Dozers) 1 <br /> <br />Total 'ob time : <br /> <br />7.06 <br /> <br />Hours <br />ze : <br />Fleet s <br />Unit cost : $0.389 /LCY Total lob cost : $1,445 <br />,.- <br />- ::.: <br />State :Colorado PermiUob# : C-81-014 <br />County :Fremont Abbreviation :none <br />Site :Southfield Mine Filename : C014-036 <br />