My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51166
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:35 PM
Creation date
11/23/2007 6:35:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/21/2007
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 , <br />Hauling Cabacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 14.00 LCY <br />Material description <br />Earth -Dry packed <br />Rated payload : 48, 000 pounds <br />Payload capacity : 18.82 LCY <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />20.00 LCY <br />17.00 LCY <br />17.00 LCY "' <br />hourly production reflects volume per scraper pair on push-pull models <br />Cvcle Time : lob Condition Corrections : Site altitude (ft.) : 6,100 <br /> Scraper Push dozer Source <br />Scraper loading time ` : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HBJ <br />'load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirf/It. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) RoII. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)'* <br />1 800 5.00 3.00 8.00 1381 0.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.64 minutes <br />Return route <br />•` travel time for each segment is adjusted Foracceleration/deceleration Refum fime : 0.34 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.48 minutes <br />Unadjusted unit production/hour : 821.15 LCY/hour'*' Adjusted for job conditions : 681.55 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 681.55 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 681.55 LCY/hour <br />JOB TIME AND COST ~~ <br />Fleet size : 1 Team(s) Total job time : 28.23 Hours <br />Unit cost : 50.786 /LCY Total job cost : $15,124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.