Laserfiche WebLink
IV. Maps <br />In general, there would appear to be an overabundance of maps in the permit. <br />In addition, many maps are not properly marked, and it is difficult to tell <br />which areas they refer to (i.e. Northern or Rienau). Many of these maps deal <br />with the operational phase of the mine and, therefore; modification of these <br />maps may be unnecessary. The Division suggests that we meet to discuss which <br />maps could be deleted and which need to be modified. <br />V. Bond <br />a) The Division has reviewed the bond document and finds that a rider <br />is required which adds the language of Rule 3.02.4(2)(b)(v)(A and <br />B). Upon receipt of this rider the bond form will be in compliance. <br />b) The Division has reviewed the bond amount and found that it is <br />adequate to cover any remaining reclamation costs. A request for <br />bond reduction is currently pending. The decision on bond reduction <br />will not be made until the site is inspected in July. <br />VI. Revisions <br />The following is a list of revisions, which according to Division records have <br />been submitted for the Meeker Area Mines. The related actions which are <br />necessary pursuant to the mid-term are also listed. <br />Revision <br />TR-A Increased Production Volume <br />TR-B Wilson-Loudy Boundary Change <br />TR-C Wilson-Loudy Land-Use Change <br />TR-D lJilson-Loudy Monitoring Reduction <br />TR-E Wilson-Loudy Land-Use Change <br />TR-O1 Hydrology 1onitoring Reduction <br />TR-02 Rienau No. 2 Portal Seal <br />TJ2-03 Deletion of Stipulation No. 8 <br />TR-04 Northern Stream Channel Reconstruction <br />TR-05 Rienau Diversion Ditch Retention <br />MR-A Small Area Exemption (79-7) <br />MR-B Boundary Change <br />MR-C Sediment Pond Modification <br />MR-O1 Wilson-Loudy Sump removal <br />MR-02 Small Area Exemption <br />MR-03 Erosion Control Plan <br />MR-04 Structure Retention <br />MR-05 Rienau Thermocouple <br />MR-06 Well Sealing <br />MR-07 Rill and Gully Plan <br />Action <br />Incorporate Rienau <br />Reclamation Plan, delete <br />remainder. <br />Incorporation in W-L Chapter <br />Incorporation in W-L Chapter <br />Incorporation in W-L Chapter <br />Incorporation in W-L Chapter <br />Incorporate <br />Incorporate <br />No action necessary <br />Incorporate <br />None-incorporated <br />Incorporate <br />Incorporate <br />Incorporate <br />Incorporate in W-L Chapter <br />Incorporate <br />Incorporate <br />Incorporate <br />Incorporate <br />None-incorporated <br />None-incorporated <br />5 <br />